MERM-7U7JAW
|
6/30/2009
|
A17.2 2.18
|
The drive machine was out of service at the time of inspection.
|
|
|
MERM-7U7JAW
|
6/30/2009
|
A17.2 5.8
|
The elevator car safety operating bushings are need of replacement.
|
|
|
MERM-7U7JAW
|
6/30/2009
|
11 CSR 40-5.090 3.A
|
The testing has not been completed due to the drive machine being out of service on the elevator at this time. The fireman?s service needs to be performed before the inspection is completed.
|
|
|
MERP-7GQULG
|
6/13/2008
|
1.6
|
The elevator ADA telephone inside the elevator is not working properlty. Check and repair the programming of this phone for proper operation and passenger safety.
|
|
|
MERP-7GQULG
|
6/13/2008
|
5.2
|
Counterweight runby must be at a minimum of 6". Counterweight runby is currently 1" and now requires the hoistway ropes to be shortened to comply with code.
|
|
|