Inspection
Inspection Details
Equipment ID
13343
13343
Inspection Date
10/18/2017
10/18/2017
Inspection Type
Annual Inspection
Annual Inspection
Inspector Name
Angelo Consiglio
Angelo Consiglio
Mechanic Name
Relief Valve Pressure
Slide
17"
17"
Governor Rope Pull
130/630 lbs. ft.
130/630 lbs. ft.
Door Closing Force
External ID
Location
Anheuser Busch- Bldg #166
One Busch Place, St. Louis, MO
Phone: (314) 577-2667
One Busch Place, St. Louis, MO
Phone: (314) 577-2667
Owner
Anheuser Busch
One Busch Place, St. Louis, MO 63118
One Busch Place, St. Louis, MO 63118
Billing
Attn: Anheuser Busch
One Busch Place, , MO 63118
One Busch Place, , MO 63118
Violations
| Code | Item | Section | Reinspection | Red Tag | Reason For Violation | Fixed Date |
|---|---|---|---|---|---|---|
| conversion | conversion | n/a | Repair bottom floor hoistway access lock box | 2/6/2019 | ||
| MO Minimum : Elevators | (A) - Hoistways | (A)8 | Repair bottom floor hoistway access lock box. | 2/6/2019 | ||
| MO Minimum : Elevators | (G) - Maintenance, Repair and Replacements | 8.6.2.1 Repair Parts | Repair hoistway lock boxes | 9/19/2025 | ||
| MO Minimum : Elevators | (G) - Maintenance, Repair and Replacements | 8.6.3.1 Replacement Parts | Replace cover on landing system on car top | 9/19/2025 | ||
| MO Minimum : Elevators | (H) - Machine Rooms | (H)8 | The GFCI outlet shall be made operable. | 9/19/2025 | ||
| MO Minimum : Elevators | (S) - Fire Service | 8.11.2.2.6 Firefighters’ Emergency Operation (Re-Inspection) | x | Phase II fire service shall be made operational, the car gate would not close properly. Re-inspection required | 1/22/2024 | |
| MO Minimum : Elevators | (A) - Hoistways | (A)16 | The GFCI electrical outlet is not working | 9/19/2025 | ||
| MO Minimum : Elevators | (A) - Hoistways | (A)1 | 4th floor door panel is coming apart and shall be replaced or repaired properly. | 9/19/2025 | ||
| MO Minimum : Elevators | (A) - Hoistways | (A)12 | Facia shall be replaced between the 4th and 5th floors | 9/19/2025 | ||
| MO Minimum : Elevators | (G) - Maintenance, Repair and Replacements | (G)1 - Door Systems 8.6.4.13 (Re-Inspection) | x | Door reopening devices shall be made operational, parts have been ordered but delayed due to the hurricane. Re-inspection required | 11/6/2024 | |
| A17.1-2016 : Elevators | 4.2 - Hoistway doors | 8.6.4.13 Door Systems | 4th floor door panel is coming apart and needs to be replaced or repaired properly. | 9/19/2025 | ||
| MO Minimum : Elevators | (A) - Hoistways | (A)1 | Facia shall be replaced between the 4th and 5th floor | 9/19/2025 | ||
| MO Minimum : Elevators | (G) - Maintenance, Repair and Replacements | (G)1 - 8.6.4.13 - Door systems | x | 2nd floor door damaged, replace or repair as needed. |