Inspection
Inspection Details
Equipment ID
11833
11833
Inspection Date
7/24/2024
7/24/2024
Inspection Type
Reinspection
Reinspection
Inspector Name
Robert Kehm
Robert Kehm
Mechanic Name
Jake Brennan
Jake Brennan
Relief Valve Pressure
NA
NA
Slide
NA
NA
Governor Rope Pull
NA
NA
Door Closing Force
NA
NA
External ID
42887a05-fde5-4905-9ab9-4e4f065c9bf4
42887a05-fde5-4905-9ab9-4e4f065c9bf4
Location
Graybar Electric- Clayton
34 N Meramec Ave, Clayton, MO
Phone: (314) 713-3393
34 N Meramec Ave, Clayton, MO
Phone: (314) 713-3393
Owner
Attn: Chase Herbst
Graybar Electric- Clayton
34 N Meramec Ave, Clayton, MO 63105
Phone: (314) 573-6599
Email: chase.herbst@graybar.com
Graybar Electric- Clayton
34 N Meramec Ave, Clayton, MO 63105
Phone: (314) 573-6599
Email: chase.herbst@graybar.com
Billing
Same as Owner
Violations
Code | Item | Section | Reinspection | Red Tag | Reason For Violation | Fixed Date |
---|---|---|---|---|---|---|
conversion | conversion | n/a | Car emergency lighting shall work. | 6/1/2018 | ||
MO Minimum : Elevators | (B) - Car Enclosure: Passenger | (B)11 Phone or alarm not functioning ( Mandatory Re-Inspection due in 14 days) | x | In car emergency telephone shall work. | 8/29/2019 | |
MO Minimum : Elevators | (B) - Car Enclosure: Passenger | (B)8 Car Lighting | In car emergency lighting shall work. | 11/11/2019 | ||
MO Minimum : Elevators | (G) - Maintenance, Repair and Replacements | (G)1 - Car Emergency Systems - 8.6.4.15 (bell, phone & Emergency lighting) | x | The in car emergency lighting shall be operational. | 11/25/2020 | |
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 2.8 - Pipes, wiring, and ducts | 2.8.1 | x | All machine room wiring shall be enclosed. | 12/13/2021 | |
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 2.8 - Pipes, wiring, and ducts | 2.8.1 | x | All wireway and electrical device covers shall be installed. | 12/13/2021 | |
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 2.8 - Pipes, wiring, and ducts | 2.8.1 | x | All temporary wiring shall be removed. | 12/13/2021 | |
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 2.3 - Lighting and receptacles | 8.11.2.1.2(c) | x | Provide at least one GFCI duplex receptacle in the machine room. | 12/13/2021 | |
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 2.7 - Fire Extinguisher | 8.6.1.6.5 | x | Provide a current ABC type fire extinguisher in the machine room. | 12/13/2021 | |
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 2.5 - Housekeeping | 8.11.2.1.2(e) (Re-Inspection) | x | Equipment in the machine room not being used in conjunction with the function or use of the elevator shall be removed. | 12/13/2021 | |
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 2.9 - Guarding of exposed auxiliary equipment | 8.11.2.1.2(i) | x | Machine guards shall be in place. | 12/13/2021 | |
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 4.1 - Car platform guard | 8.11.2.1.4(a) | x | The platform guard (apron) is 39.5" and should be 48". The pit is of inadequate depth to support a 48" toe guard. Variance may be required. | 12/13/2021 | |
MO Minimum : Elevators | 11 CSR 40-5.090 Inspection and Testing | (3) Testing Procedures (Re-Inspect) | x | The building work in progress includes running some or all of the elevators in this group under standby emergency power. When work is complete, the tests and requirements of A17.2 items 1.17 & 4.12, A17.1-2005 - 8.10.2.2 shall apply. | 12/13/2021 | |
MO Minimum : Elevators | 11 CSR 40-5.090 Inspection and Testing | (3) Testing Procedures (Re-Inspect) | x | The building work in progress includes a remote fire control panel. When work is complete, the tests and requirements of A17.2 item 6.4, A17.1-2005 - 8.10.2.2.6 shall apply. | 12/13/2021 | |
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 2.41 - Maintenance Records | 8.6.1.4 | A code compliant MCP and all the on-site documentation required by A17.1 2016 - 8.6.1.2.2 and 8.6.1.4 shall be provided in the machine room. (This item is for notification purposes for future violation in 2022) | 9/22/2022 | ||
MO Minimum : Elevators | 11 CSR 40-5.090 Inspection and Testing | (3) Testing Procedures (Re-Inspect) | x | The building work in progress includes a remote fire control panel. When work is complete, the tests and requirements of A17.2 item 6.4, A17.1-2005 - 8.10.2.2.6 shall apply. | 11/22/2022 | |
MO Minimum : Elevators | 11 CSR 40-5.090 Inspection and Testing | (3) Testing Procedures (Re-Inspect) | x | The building work in progress includes running some or all of the elevators in this group under standby emergency power. When work is complete, the tests and requirements of A17.2 items 1.17 & 4.12, A17.1-2005 - 8.10.2.2 shall apply. | 11/22/2022 | |
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 2.5 - Housekeeping | 8.6.4.8 Machine Rooms and Machinery Spaces | Equipment in the machine room not being used in conjunction with the function or use of the elevator shall be removed. | 9/22/2022 | ||
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 2.8 - Pipes, wiring, and ducts | 2.8.1 | All machine room wiring shall be enclosed. | 9/22/2022 | ||
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 2.3 - Lighting and receptacles | 8.11.2.1.2(c) | Provide at least one GFCI duplex receptacle in the machine room. | 9/22/2022 | ||
MO Minimum : Elevators | 11 CSR 40-5.090 Inspection and Testing | (3) Testing Procedures (Re-Inspect) | x | Elevators that are equipped to operate on emergency power shall be tested with no load in the car while operating on the emergency generator. | 11/9/2023 | |
MO Minimum : Elevators | 11 CSR 40-5.090 Inspection and Testing | (3) Testing Procedures (Re-Inspect) | x | Emergency power must be tested annually. (Scheduled for 11/15/23) | 11/15/2023 | |
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 1.17 - Standby power operation | 2.27.2 | x | Emergency power must be tested annually. | 7/24/2024 |