Inspection
Inspection Details
Equipment ID
26672
26672
Inspection Date
9/23/2024
9/23/2024
Inspection Type
New Installation
New Installation
Inspector Name
Sean Carmody
Sean Carmody
Mechanic Name
Benjamin Postawko
Benjamin Postawko
Relief Valve Pressure
NA
NA
Slide
10"
10"
Governor Rope Pull
45/122
45/122
Door Closing Force
25
25
External ID
668692ee-e5c1-48d5-9716-2877760bb44f
668692ee-e5c1-48d5-9716-2877760bb44f
Location
Marriott AC Hotel Clayton
227 S Central Ave, Clayton, MO
Phone: (618) 330-8010
Email: JFLINT@MIDAS.BUILD
227 S Central Ave, Clayton, MO
Phone: (618) 330-8010
Email: JFLINT@MIDAS.BUILD
Owner
Attn: Concord Hospitality Enterprises Company
Concord Hospitality Enterprises Company
11410 Common Oaks Dr, Raleigh, NC 27614
Phone: (919) 278-1603
Concord Hospitality Enterprises Company
11410 Common Oaks Dr, Raleigh, NC 27614
Phone: (919) 278-1603
Billing
Same as Owner
Violations
| Code | Item | Section | Reinspection | Red Tag | Reason For Violation | Fixed Date |
|---|---|---|---|---|---|---|
| A17.1-2016 : Elevators | 2.8 - Pipes, wiring, and ducts | 2.8 | x | Heat detector shall be within 24" of sprinkler head. | 10/11/2024 | |
| A17.1-2016 : Elevators | 2.3 - Lighting and receptacles | 2.7.9.1 | x | There is not enough light in control space. | 10/11/2024 | |
| A17.1-2016 : Elevators | 3.12 - Pipes, wiring, and ducts | 2.8 | x | Relocate heat and smoke detectors from hoisting beam in hoistway to the ceiling of the hoistway. | 10/11/2024 | |
| MO Minimum : Elevators | (G) - Maintenance, Repair and Replacements | 8.6.1.6.7 Signs and Data Plates | x | Maximum hoisting capacity needs to be listed on hoisting beam. | 10/11/2024 | |
| A17.1-2016 : Elevators | 3.12 - Pipes, wiring, and ducts | 2.8 | x | Plug holes in electrical boxes at the top of hoistway. | 10/11/2024 | |
| A17.1-2016 : Elevators | 3.12 - Pipes, wiring, and ducts | 2.8 | x | Add GFCI outlet at top of hoistway. | 10/11/2024 | |
| A17.1-2016 : Elevators | 5.1 - Pit access, lighting, stop switch, and condition | 2.2.5 | x | The pit light shall be operational. | 10/11/2024 | |
| A17.1-2016 : Elevators | 3.10 - Hoistway construction | 2.1 | x | Fire caulk holes, gaps under sills, & around all beams in hoistway. | 10/11/2024 | |
| A17.1-2016 : Elevators | 3.10 - Hoistway construction | 2.1 | x | Fill 6" gap at the top landing in hoistway and clean down hoistway. | 10/11/2024 | |
| MO Minimum : Elevators | 11 CSR 40-5.090 Inspection and Testing | (1) Minimum Standard | x | Vent needs to be more than 36" from heat & smoke detector at top landing. | 10/11/2024 | |
| A17.1-2016 : Elevators | 5.1 - Pit access, lighting, stop switch, and condition | 2.2.4 | x | Pit ladder is 42" & needs to be 48" above the sill. | 10/11/2024 | |
| A17.1-2016 : Elevators | 5.1 - Pit access, lighting, stop switch, and condition | 2.2.2.5 Sump Pump Required/Capacity (Re-Inspect) | x | The sump pump is not wired. | 10/11/2024 | |
| MO Minimum : Elevators | 11 CSR 40-5.090 Inspection and Testing | (3) Testing Procedures (Re-Inspect) | x | The testing has not been completed on the elevator at this time. The emergency power operation and fireman’s service operation shall be tested before the inspection is completed. | 3/10/2026 | |
| MO Minimum : Elevators | (G) - Maintenance, Repair and Replacements | 8.6.1.6 General Maintenance Methods | The battery back–up rescue device was tested and did not operate as designed, the elevator failed to pick the brake as required.. Repair the device to operate as it is designed. Reinspection required. | 3/10/2026 |