Inspection
Inspection Details
Equipment ID
23577
23577
Inspection Date
12/19/2024
12/19/2024
Inspection Type
Annual Inspection
Annual Inspection
Inspector Name
Jerry Eckhart
Jerry Eckhart
Mechanic Name
Brant Willtrout
Brant Willtrout
Relief Valve Pressure
na
na
Slide
na
na
Governor Rope Pull
na
na
Door Closing Force
15
15
External ID
d21fcb5f-96fc-40ed-916d-f9d836353681
d21fcb5f-96fc-40ed-916d-f9d836353681
Location
Everly on the Loop
6105 Delmar Blvd, St. Louis, MO
Phone: (314) 896-4660
Email: mhawkins@everlyontheloop.com
6105 Delmar Blvd, St. Louis, MO
Phone: (314) 896-4660
Email: mhawkins@everlyontheloop.com
Owner
Attn: Coastal Ridge Real Estate
Everly on the Loop
6105 Delmar Blvd, St. Louis, MO 63112
Phone: (314) 896-4660
Email: mhawkins@everlyontheloop.com
Everly on the Loop
6105 Delmar Blvd, St. Louis, MO 63112
Phone: (314) 896-4660
Email: mhawkins@everlyontheloop.com
Billing
Same as Owner
Violations
Code | Item | Section | Reinspection | Red Tag | Reason For Violation | Fixed Date |
---|---|---|---|---|---|---|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 1.6 - Car emergency signal | 8.11.2.1.1(f) (Insp code) Phone or alarm not functioning (Mandatory Re-Inspection due in 14 days) | x | The elevator ADA telephone inside the elevator is not operating correctly. Check and repair the programming of this phone for proper operation and passenger safety. Reinspection required. | 1/5/2022 | |
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 2.13 - Governor,overspeed switch and seal | 8.11.2.1.2(bb) | x | The remote governor activation device does not operate. Without this device in operation a category 5 test cannot be performed which will be required in 2022. Repair or replace the governor activation switch to operate as required. Reinspection required. | 1/5/2022 | |
A17.1-2016 : Elevators | 2.12 - Controller Wiring, Fuses, Grounding, Etc. | 8.11.2.1.2(q) | The emergency rescue battery in the controller has not been changed since the installation date. The Manufacture’s written procedure is for replacement every 3 years. If the battery becomes depleted the elevator will automatically stop operating. Replace the battery of this elevator before it shuts down due to battery being depleted. | |||
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 2.13 - Governor,overspeed switch and seal | 8.11.2.1.2(bb) | x | Govenor overspeed switch & seal, remoter govenor activation device does not work. Re-inspection required | 9/22/2022 | |
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 1.6 - Car emergency signal | 8.6.4.15 Phone or alarm not functioning (Mandatory Re-Inspection due in 14 days) | x | 2 way communication is not working. Re-inspection required | 3/27/2024 | |
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 2.12 - Controller Wiring, Fuses, Grounding, Etc. | 8.6.1.6.3 | Rescue batteries do not appear to have been replaced, provide also write date on batteries and in MCP. | |||
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 2.41 - Maintenance Records | 8.6.1.4 | Provide MCP. | |||
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 2.5 - Housekeeping | 8.6.4.9 Cleaning of Car Tops | Clean the car top. | |||
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 2.5 - Housekeeping | 8.6.4.7 Cleaning of Hoistways and Pits | Clean down the hoistway. | |||
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 5.1 - Pit access, lighting, stop switch, and condition | 8.6.4.7 Cleaning of Pits | Clean the pit. | |||
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 6.4 - Firefighters' service (A17.1b-1989 and later editions) | 2.27.7 Firefighters' Emergency Operation: Operating Procedures | Post Phase I instructions near the f/f switch in the lobby. | |||
A17.1-2016 : Elevators | 1.17 - Standby power operation | 8.6.4.19.7 (Re-Inspection) | x | Provide testing of the elevator on emergency power. | 12/19/2024 | |
A17.1-2016 : Elevators | 4.12 - Standby power selection switch | 8.6.4.19.7 (Re-Inspection) | x | Provide testing of the elevator emergency power selector switch. | 12/19/2024 | |
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | CSR 40-5.100 State Operating Certificate | 5.100(2) Display of Operating Certificate | Post current State Elevator Certificate. | |||
A17.1-2016 : Elevators | 1.17 - Standby power operation | 2.27.2.3 (Elevator Emergency Power Illuminated Signal) | Need to repair emergency power indicator jewel for proper operation. |