Inspection
Inspection Details
Equipment ID
6056
6056
Inspection Date
7/29/2025
7/29/2025
Inspection Type
Reinspection
Reinspection
Inspector Name
Dequarius Millett
Dequarius Millett
Mechanic Name
Alex Brinkman
Alex Brinkman
Relief Valve Pressure
N/A
N/A
Slide
N/A
N/A
Governor Rope Pull
N/A
N/A
Door Closing Force
N/A
N/A
External ID
bb99bdd2-f16e-4ea2-88e4-dc67318524b7
bb99bdd2-f16e-4ea2-88e4-dc67318524b7
Location
The 900 Walnut Building
900 Walnut St, St. Louis, MO
Phone: (314) 335-3800
900 Walnut St, St. Louis, MO
Phone: (314) 335-3800
Owner
Attn: Angela M. O’Hanlon
900 Walnut Owner LLC and 210 N Tucker Owner, LLC
P210 N Tucker Blvd, Ste 1030, St. Louis, MO 63101
Phone: (314) 335-3802
Alt Phone: (314) 919-7145
Email: hyorg@netrality.com
900 Walnut Owner LLC and 210 N Tucker Owner, LLC
P210 N Tucker Blvd, Ste 1030, St. Louis, MO 63101
Phone: (314) 335-3802
Alt Phone: (314) 919-7145
Email: hyorg@netrality.com
Billing
Same as Owner
Violations
| Code | Item | Section | Reinspection | Red Tag | Reason For Violation | Fixed Date |
|---|---|---|---|---|---|---|
| MO Minimum : Elevators | (G) - Maintenance, Repair and Replacements | (G)1 Maintenance, Repair and Replacements | No | No | 1.6 - The elevator ADA telephone inside the elevator is not working properly. Check and repair the phone line of this phone for proper operation and passenger safety. | 5/20/2019 |
| A17.1-2016 : Elevators | 4.1 - Car platform guard | 2.15.9 | Yes | No | Obstruction in pit will not accommodate a 48" platform guard. Customer will need to request a variance. | 5/31/2023 |
| A17.1-2016 : Elevators | 6.4 - Firefighters' service (A17.1b-1989 and later editions) | 2.27.3.1.1 Phase I Emergency Recall Operation | Yes | Yes | Test fire service switch at lobby hall station after new one is installed. | 5/31/2023 |
| A17.1-2016 : Elevators | 2.1 - Access to machine space | 2.7.3.4 | Yes | No | Provide a self-closing and self-locking machine room door. | 5/31/2023 |
| A17.1-2016 : Elevators | 2.1 - Access to machine space | 2.7.3.1 | Yes | No | Provide a permanent step at the machine room entrance. | 5/31/2023 |
| A17.1-2016 : Elevators | 1.17 - Standby power operation | 8.6.4.19.7 (Re-Inspection) | Yes | No | Test standby power when installation is complete. | 5/31/2023 |
| A17.1-2016 : Elevators | 3.12 - Pipes, wiring, and ducts | 2.8 | Yes | No | Install hoistway duct covers. | 5/31/2023 |
| A17.1-2016 : Elevators | 3.12 - Pipes, wiring, and ducts | 2.8 | Yes | No | Remove temporary wiring from hoistway. | 5/31/2023 |
| A17.1-2016 : Elevators | 4.2 - Hoistway doors | 2.11 | Yes | No | Cover old escutcheon holes in hoistway doors. | 5/31/2023 |
| A17.1-2016 : Elevators | 2.8 - Pipes, wiring, and ducts | 2.8 | Yes | No | Install machine room duct covers. | 5/31/2023 |
| A17.1-2016 : Elevators | 2.8 - Pipes, wiring, and ducts | 2.8 | Yes | No | Remove all temporary wiring from the machine room. | 5/31/2023 |
| A17.1-2016 : Elevators | 2.14 - Code data plate | 8.9 | Yes | No | 8.10.1.1.4 - Provide acceptance test tag permanently attached to controller. | 5/31/2023 |
| A17.1-2016 : Elevators | 1.17 - Standby power operation | 2.27.2 | Yes | No | elevator is on emergency generator power and has not been tested. Generator testing shall occur to complete the annual inspection | 7/29/2025 |