Inspection
Inspection Details
Equipment ID
27066
27066
Inspection Date
8/19/2025
8/19/2025
Inspection Type
New Installation
New Installation
Inspector Name
Christopher "RED" Staton
Christopher "RED" Staton
Mechanic Name
Jason Stahlschmidt
Jason Stahlschmidt
Relief Valve Pressure
NA
NA
Slide
Instantaneous
Instantaneous
Governor Rope Pull
30/112
30/112
Door Closing Force
18
18
External ID
135d3def-6106-4a5b-9888-ad7a5a01f848
135d3def-6106-4a5b-9888-ad7a5a01f848
Location
2500 Ohio Historic Rehab
2500 Ohio Ave, St. Louis, MO
Phone: (314) 391-8900
Email: tlienemann@blacklinestl.com
2500 Ohio Ave, St. Louis, MO
Phone: (314) 391-8900
Email: tlienemann@blacklinestl.com
Owner
Attn: Todd Lienemann
Blackline Design & Construction
2217 Locust St, St. Louis, MO 63103
Phone: (314) 391-8900
Email: tlienemann@blacklinestl.com
Blackline Design & Construction
2217 Locust St, St. Louis, MO 63103
Phone: (314) 391-8900
Email: tlienemann@blacklinestl.com
Billing
Same as Owner
Violations
| Code | Item | Section | Reinspection | Red Tag | Reason For Violation | Fixed Date |
|---|---|---|---|---|---|---|
| A17.1-2016 : Elevators | 1.15 - sign and operating device symbols | 8.6.1.6.7 | x | Replace missing "Do not use elevator in case of fire" signage on multiple floors. | 9/23/2025 | |
| A17.1-2016 : Elevators | 2.3 - Lighting and receptacles | 2.7.9.1 | x | Machine space shall have GFCI outlet. Currently standard outlet. | 9/23/2025 | |
| A17.1-2016 : Elevators | 2.3 - Lighting and receptacles | 2.7.9.1 | x | Machine space lighting shall not be less than 19fc at floor. | 9/23/2025 | |
| A17.1-2016 : Elevators | 3.10 - Hoistway construction | 2.1 | x | Fill hoistway fire/smoke penetrations with proper material. | 9/23/2025 | |
| A17.1-2016 : Elevators | 3.10 - Hoistway construction | 2.1 | x | Top of hoistway has multiple screws penetrating ceiling, creating hazard for cartop. | 9/23/2025 | |
| A17.1-2016 : Elevators | 3.10 - Hoistway construction | 2.1 | x | Top of hoistway angle brackets attached to ceiling; all anchor bolts are loose. | 9/23/2025 | |
| A17.1-2016 : Elevators | 4.2 - Hoistway doors | 2.11 | x | Landing door sill at LL has large gap. Shall be filled and flush. | 9/23/2025 | |
| MO Minimum : Elevators | 11 CSR 40-5.090 Inspection and Testing | 8.10 Acceptance Inspection and Test | x | Landing lighting at LL not installed. Install and verify greater than 5fc. | 9/23/2025 | |
| A17.1-2016 : Elevators | 3.10 - Hoistway construction | 2.1 | x | Fill pit fire/smoke penetrations with proper materials (fire caulk). | 9/23/2025 | |
| A17.1-2016 : Elevators | 5.1 - Pit access, lighting, stop switch, and condition | 2.2.2.5 Sump Pump Required/Capacity (Re-Inspect) | x | Verify sump pump capable of 3000GPH per elevator. Unable to move cover to verify. | 9/23/2025 | |
| A17.1-2016 : Elevators | 5.1 - Pit access, lighting, stop switch, and condition | 2.2.2.6 Sump Pump Covers | x | Replace pit sump cover with appropriate cover, removable and allows for proper drainage (currently 1/2" plate steel, lacking proper drainage flow and not serviceable) | 8/28/2025 | |
| A17.1-2016 : Elevators | 5.2 - Bottom clearance, runby, and minimum refuge space | 8.6.4.11 Runby (Re-Inspect) | x | Runby exceeds OEM spec of 7" from buffer to strike plate. | 8/28/2025 | |
| MO Minimum : Elevators | 11 CSR 40-5.090 Inspection and Testing | 8.10 Acceptance Inspection and Test | x | Mainline disconnecting means (2) shall be provided with a compliant mechanical auxiliary contact to disconnect the load from the auxiliary power supply in event of shunt or manual disconnect. | 8/28/2025 | |
| A17.1-2016 : Elevators | 3.12 - Pipes, wiring, and ducts | 2.8 | x | Top of hoistway exhaust fan shall stop operation in the event of FAID activation. | 8/28/2025 |