Inspection
Inspection Details
Equipment ID
2329
2329
Inspection Date
9/2/2025
9/2/2025
Inspection Type
Alteration
Alteration
Inspector Name
Vernon Livergood
Vernon Livergood
Mechanic Name
Wesley Cook
Wesley Cook
Relief Valve Pressure
000
000
Slide
Governor Rope Pull
Door Closing Force
00
00
External ID
6af8f554-f6c3-4809-90b5-70bc79797f8b
6af8f554-f6c3-4809-90b5-70bc79797f8b
Location
Housing Unit #11
3401 Faraon St, St. Joseph, MO
Phone: (816) 387-2158
3401 Faraon St, St. Joseph, MO
Phone: (816) 387-2158
Owner
Attn: INTERAGENCY
WRDCC-INTERAGENCY
3401 Faraon St, St. Joseph, MO 64506
Phone: (816) 273-1907
Email: linda.weis@doc.mo.gov
WRDCC-INTERAGENCY
3401 Faraon St, St. Joseph, MO 64506
Phone: (816) 273-1907
Email: linda.weis@doc.mo.gov
Billing
Attn: INTERAGENCY
WRDCC-INTERAGENCY
3401 Faraon St, St. Joseph, MO 64506
Phone: (816) 273-1912
WRDCC-INTERAGENCY
3401 Faraon St, St. Joseph, MO 64506
Phone: (816) 273-1912
Violations
| Code | Item | Section | Reinspection | Red Tag | Reason For Violation | Fixed Date |
|---|---|---|---|---|---|---|
| conversion | conversion | n/a | Provide fire service instructions inside and outside elevator. | 2/22/2023 | ||
| MO Minimum : Elevators | (G) - Maintenance, Repair and Replacements | 8.6.5.5.2 Oil Leakage Collection | Remove scavenger pump from pit. Cylinder drain line needs to be ran to pit container of no more than 5 gallons. | 2/22/2023 | ||
| MO Minimum : Elevators | (I) - Pits | (I)1 | Remove standing water from pit. Pits shall be kept dry and clean. | 2/22/2023 | ||
| MO Minimum : Elevators | (S) - Fire Service | (S)1 | x | x | Firefighter phase 2 operation does not overide security for bottom floor car call. 14 days to correct or elevator will be red tagged. | 8/23/2021 |
| MO Minimum : Elevators | (S) - Fire Service | 8.6.11.1 Monthly Test and Log | Test and log firefighter operation monthly | 9/8/2021 | ||
| MO Minimum : Elevators | (G) - Maintenance, Repair and Replacements | 8.6.5.5.2 Oil Leakage Collection | Remove scavenger pump from pit | 9/8/2021 | ||
| MO Minimum : Elevators | (G) - Maintenance, Repair and Replacements | 8.6.5.5.1 Examination and Maintenance | Replace plunger packing. Packing leaks excessively | 9/8/2021 | ||
| MO Minimum : Elevators | (S) - Fire Service | 211.7 Firefighters Operations/Signage | Firefighter instructions inside the elevator need to be for phase 2 operation not phase 1 | 9/8/2021 | ||
| MO Minimum : Elevators | (S) - Fire Service | 211.7 Firefighters Operations/Signage | Firefighter instructions next to hall fire keyswitch need to be for phase 1 operation not phase 2 | 9/8/2021 | ||
| MO Minimum : Elevators | (S) - Fire Service | (S)1 | x | x | Firefighter phase 2 operation does not override security for bottom floor car call. 14 days to repair or red tagged. May apply for variance from the state | 9/8/2021 |
| MO Minimum : Elevators | (G) - Maintenance, Repair and Replacements | 8.6.5.5.2 Oil Leakage Collection | Remove scavenger pump from pit | 2/22/2023 | ||
| MO Minimum : Elevators | (G) - Maintenance, Repair and Replacements | 8.6.5.5.1 Examination and Maintenance | Replace plunger seal. Seal leaks excessively | 2/22/2023 | ||
| MO Minimum : Elevators | (G) - Maintenance, Repair and Replacements | 8.6.1.6.5 Fire Extinguishers | Machine room fire extinguisher certification is expired. | 2/22/2023 | ||
| MO Minimum : Elevators | (G) - Maintenance, Repair and Replacements | 8.6.1.2.1 General Maintenance Requirements Documentation | No MCP | 2/22/2023 | ||
| MO Minimum : Elevators | (G) - Maintenance, Repair and Replacements | 8.6.1.4.1(a) On-Site Maintenance Records (MCP Records) | MRL not up to date | 2/22/2023 | ||
| MO Minimum : Elevators | CSR 40-5.100 State Operating Certificate | 5.100(2) Display of Operating Certificate | State operating certificate not displayed | 2/22/2023 | ||
| MO Minimum : Elevators | (S) - Fire Service | 211.7 Firefighters Operations/Signage | PROVIDE PHASE 2 FIRE SERVICE SIGNAGE | 8/8/2024 |