Inspection
Inspection Details
Equipment ID
26101
26101
Inspection Date
4/7/2026
4/7/2026
Inspection Type
Annual Inspection
Annual Inspection
Inspector Name
Cynthia "CJ" Brady
Cynthia "CJ" Brady
Mechanic Name
Jeff Setchfield
Jeff Setchfield
Relief Valve Pressure
NA
NA
Slide
Softset
Softset
Governor Rope Pull
NA
NA
Door Closing Force
20
20
External ID
a5f95734-08f0-4587-a2a7-24cb19b7fa97
a5f95734-08f0-4587-a2a7-24cb19b7fa97
Location
Chapter at the Streets of St. Charles
333 Mulholland Dr, St. Charles, MO
Phone: (833) 706-5538
333 Mulholland Dr, St. Charles, MO
Phone: (833) 706-5538
Owner
Attn: Chapter at the Streets, LLC
Chapter at the Streets, LLC
333 Mulholland Dr, St. Charles, MO 63303
Phone: (636) 283-2331
Email: carlac@2bresidential.com
Chapter at the Streets, LLC
333 Mulholland Dr, St. Charles, MO 63303
Phone: (636) 283-2331
Email: carlac@2bresidential.com
Billing
Same as Owner
Violations
| Code | Item | Section | Reinspection | Red Tag | Reason For Violation | Fixed Date |
|---|---|---|---|---|---|---|
| A17.1-2016 : Elevators | 2.3 - Lighting and receptacles | 2.8.2 | Yes | No | Increase machine space to 19 ft-candles minimum | 5/11/2023 |
| A17.1-2016 : Elevators | 2.3 - Lighting and receptacles | 2.8.2 | Yes | No | Increase control space illumination to 19 ft-candles minimum | 5/11/2023 |
| A17.1-2016 : Elevators | 2.8 - Pipes, wiring, and ducts | 2.8.3 | Yes | No | Provide shunt trip for mainline disconnect. Activated by heat detector. | 5/11/2023 |
| A17.1-2016 : Elevators | 3.11 - Hoistway smoke control | 2.1.4 | Yes | No | Provide a means of smoke control in the hoistway compliant with the building code | 5/11/2023 |
| A17.1-2016 : Elevators | 1.17 - Standby power operation | 2.27.2 | Yes | No | The emergency/standby power shall be tested. | 8/27/2024 |
| A17.1-2016 : Elevators | 6.4 - Firefighters' service (A17.1b-1989 and later editions) | 2.27.3 | Yes | Yes | When the car is on phase two fire service and at a landing, with the doors open, and the "FIRE OPERATION" switch is in the "HOLD" position, the car shall remain at the landing with the doors open. Note: Currently when phase two hold operation is selected, the car doors close and the elevator runs to the primary floor of egress. This shall be corrected within 14 days. Not currently red tagged as there are only 2 elevators in this facility and 300 apartment units. | 8/27/2024 |
| A17.1-2016 : Elevators | 2.7 - Fire Extinguisher | 8.6.1.6.5 | No | No | An ABC fire extinguisher with a current test tag shall be mounted convient to the machine room door. | 6/13/2025 |
| A17.1-2016 : Elevators | 1.17 - Standby power operation | 2.27.2 | Yes | No | Elevators that are equipped to operate on emergency power shall be tested with no load in car, operating on emergency power annually. | 5/22/2025 |
| A17.1-2016 : Elevators | 2.40 - Maintenance Records | 8.6.1.2.2 On-Site Documentation | No | No | Compliant/required documentaion shall be kept on-site including MCP wiring diagrams, PM log, callback log, evacuation procedures & fire service log to be recorded monthly. No documentation on-site for 2023, 2024, 2025. | 6/13/2025 |
| A17.1-2016 : Elevators | CSR 40-5.100 State Operating Certificate | 5.100(2) Display of Operating Certificate | No | No | A current MO State operating certificate shall be posted in the elevator equipment room, in a noncombustible frame with a clear protective vision plate over it. | 6/13/2025 |
| A17.1-2016 : Elevators | CSR 40-5.100 State Operating Certificate | 5.100(2) Display of Operating Certificate | No | No | No State operating certificate in the machine room. | 5/7/2026 |