Inspection
Inspection Details
Equipment ID
16887
16887
Inspection Date
4/2/2019
4/2/2019
Inspection Type
Reinspection
Reinspection
Inspector Name
Derek Rankin
Derek Rankin
Mechanic Name
Mark Brown
Mark Brown
Relief Valve Pressure
Slide
Governor Rope Pull
Door Closing Force
External ID
0bf053ef-f2dc-42fd-bbd9-434c6fc49844
0bf053ef-f2dc-42fd-bbd9-434c6fc49844
Location
St. Louis Busch Stadium
700 CLARK AVE, SAINT LOUIS, MO
700 CLARK AVE, SAINT LOUIS, MO
Owner
St. Louis Cardinals LLC
700 CLARK AVE, SAINT LOUIS, MO 63102-1727
700 CLARK AVE, SAINT LOUIS, MO 63102-1727
Billing
Attn: St. Louis Cardinals LLC
700 CLARK AVE, SAINT LOUIS, MO 63102-1727
700 CLARK AVE, SAINT LOUIS, MO 63102-1727
Violations
Code | Item | Section | Reinspection | Red Tag | Reason For Violation | Fixed Date |
---|---|---|---|---|---|---|
conversion | conversion | conversion - reinspect | x | Comb impact guides are rusted and need to be tested to insure roper impact calibration. | 2/18/2019 | |
A17.1-1996 : Escalators | 7.7 - Combplate and comb step impact device | 807.3 | Comb impact guides are rusted. Pressure test on tripping pressure needed. Reinspect in 30 days. | 3/29/2023 | ||
A17.1-1996 : Escalators | 7.3 - Handrails | 802.2 | Both handrails are cracked. | 7/12/2023 | ||
A17.1-1996 : Escalators | 7.5 - Lighting | 805.7 | Lower demarcation lights do not work. | 7/12/2023 | ||
A17.1-1996 : Escalators | 7.7 - Combplate and comb step impact device | 802.6 | Replace two broken step demarcations. | 7/12/2023 | ||
A17.1-1996 : Escalators | 7.5 - Lighting | 805.7 | Demarcation light at the top landing does not work | 7/12/2023 | ||
A17.1-2016 : Elevators | 7.17 - Step/skirt clearances, panels, and performance index | 8.6.8.3.3 | x | Step/skirt clearances exceeded the allowed amount of .25. | 7/21/2023 | |
A17.1-2016 : Elevators | 7.3 - Handrails | 8.6.8.1 | Right handrail is cracked and has possible pinching hazards. Replace handrail | 7/12/2023 | ||
A17.1-2016 : Elevators | 7.17 - Step/skirt clearances, panels, and performance index | 8.6.8.3.3 | Step/skirt clearances exceeded the allowed amount of .25 on the upper right side. | 8/13/2024 | ||
Missouri Minimum : Escalators | (T) - Existing Dumbwaiters, Escalators and Moving Walks | 8.6.8.2 Escalator Step-to-Skirt Clearance | x | Adjust right side skirt at top for proper clearence to pass the loaded gap and index testing | 8/13/2024 | |
A17.1-1996 : Escalators | 7.3 - Handrails | 802.2 | Replace left side handrail | |||
A17.1-1996 : Escalators | 7.3 - Handrails | 802.2 | Adjust handrail tension- both handrails | |||
A17.1-1996 : Escalators | 7.5 - Lighting | 806.2 | Provide lighting at upper end of unit per code. | |||
A17.1-2016 : Elevators | 9.19 - Maintenance Records | 8.6.1.4.1(b)(1) | On site maintenance records for call backs, repairs ,testing, & indexing to be on site and location of where they are located listed | |||
A17.1-2016 : Elevators | 2.5 - Housekeeping | 8.6.4.8 Machine Room and Machinery Space | Clean out lower end pit of escalator - leaves and Debris |