Inspection
Inspection Details
Equipment ID
1099
1099
Inspection Date
8/26/2019
8/26/2019
Inspection Type
Annual Inspection
Annual Inspection
Inspector Name
James Mueller
James Mueller
Mechanic Name
Thomas Droege
Thomas Droege
Relief Valve Pressure
510
510
Slide
Governor Rope Pull
Door Closing Force
16
16
External ID
9dfb69a1-1021-4dc0-bf2b-e8f06f46d0be
9dfb69a1-1021-4dc0-bf2b-e8f06f46d0be
Location
St. Louis Gateway Transportation Center
430 S 15TH ST, SAINT LOUIS, MO
Phone: (314) 622-4635
430 S 15TH ST, SAINT LOUIS, MO
Phone: (314) 622-4635
Owner
City of St. Louis
1200 MARKET ST RM 301, SAINT LOUIS, MO 63103-2806
1200 MARKET ST RM 301, SAINT LOUIS, MO 63103-2806
Billing
Attn: St. Louis Gateway Transportation Center
430 S 15TH ST, SAINT LOUIS, MO 63103-2607
430 S 15TH ST, SAINT LOUIS, MO 63103-2607
Violations
Code | Item | Section | Reinspection | Red Tag | Reason For Violation | Fixed Date |
---|---|---|---|---|---|---|
conversion | conversion | conversion - reinspect | x | Pit shall be kept clean and dry. Pit is currently full of oil. | 7/24/2018 | |
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 2.3 - Lighting and receptacles | 8.11.2.1.2(c) | Replace existing automatic light switch in machine room with mechanical type. | 8/11/2020 | ||
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 2.3 - Lighting and receptacles | 8.11.2.1.2(c) | A/C receptacle is not properly wired and shall be repaired. | 8/11/2020 | ||
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 2.6 - Ventilation | 8.11.2.1.2(f) | Provide existing A/C unit in machine room to work. | 8/11/2020 | ||
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 2.5 - Housekeeping | 8.11.2.1.2(e) (Re-Inspection) | The machine room shall be cleaned and any items not related to the operation of the elevator shall be removed. | 12/1/2022 | ||
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 5.1 - Pit access, lighting, stop switch, and condition | 8.6.4.7 Cleaning of Pits | Fluids are leaking into the pit. Remove fluids and determine source to stop future leakage. | 8/11/2020 | ||
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 5.1 - Pit access, lighting, stop switch, and condition | 2.2.3 Guards Between Adjacent Pits | Clean the pit of excess oil and water. | 11/7/2023 | ||
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 2.41 - Maintenance Records | 8.6.1.4 | A code compliant MCP and all the on-site documentation required by A17.1 2016 - 8.6.1.2.2 and 8.6.1.4 shall be provided in the machine room. (This item is for notification purposes for future violation in 2022) | 8/11/2023 | ||
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | CSR 40-5.100 State Operating Certificate | 5.100(2) Display of Operating Certificate | A current MO State operating certificate shall be obtained and displayed in the elevator machine room. | 8/11/2023 | ||
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 11 CSR 40-5.090 Inspection and Testing | 8.6.5.16.5 Over Speed Valve Testing | This elevator is equipped with an overspeed valve. Based on the installation year, a category 5 test is due on or before the next annual inspection. | 9/25/2023 | ||
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | CSR 40-5.100 State Operating Certificate | 5.100(2) Display of Operating Certificate | A current MO State operating certificate shall be displayed in the elevator machine room. | 10/19/2023 | ||
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 1.6 - Car emergency signal | 3.27 (Hydro) Phone or alarm not functioning (Mandatory Re-Inspection due in 14 days) | x | Emergency personal shall be able to identify the correct elevator number. | 9/25/2023 | |
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 1.17 - Standby power operation | 3.26.10 (Auxiliary Power)(Re-Inspection) | x | Where auxiliary lowering operating is provided, it shall conform to 3.26.10.1 through 3.26.10.3. | 9/25/2023 | |
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 1.17 - Standby power operation | 3.26.10 (Auxiliary Power)(Re-Inspection) | x | Where auxiliary lowering operation is provided, it shall conform to 3.26.10 through 3.26.10.3. | 7/16/2024 | |
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 2.11 - Disconnecting Means and Control | 2.26.4 | x | NFPA70 - 620.91 - Machine room disconnecting means shall be provided with a compliant mechanical auxiliary contact to disconnect the load from the auxiliary power supply. | 7/16/2024 | |
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 1.14 - Ventilation | 2.14.2.3 | x | 2.14.2.3.3 - Observation elevator, exposed to direct sunlight, shall have a cab fan with 1 hour rated emergency power source. | 7/16/2024 | |
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 1.6 - Car emergency signal | 3.27 (Hydro) Phone or alarm not functioning (Mandatory Re-Inspection due in 14 days) | x | Emergency personnel shall be able to identify the correct elevator number. | 7/16/2024 | |
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 6.4 - Firefighters' service (A17.1b-1989 and later editions) | 8.6.11.1 Firefighters Emergency Operation: Monthly Testing | Record monthly fire service testing. | |||
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | CSR 40-5.100 State Operating Certificate | 5.100(2) Display of Operating Certificate | A current MO State operating certificate shall be displayed in the elevator machine room. | |||
MO Minimum : Elevators | (G) - Maintenance, Repair and Replacements | 8.6.1.6.7 Signs and Data Plates | COP shall have car number displayed. | |||
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | CSR 40-5.100 State Operating Certificate | 5.100(2) Display of Operating Certificate | A current MO State operating certificate shall be displayed in the elevator machine room. | |||
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 1.17 - Standby power operation | 3.26.10 (Auxiliary Power)(Re-Inspection) | x | Where auxiliary lowering operation is provided, it shall conform to 3.26.10 through 3.26.10.3. | ||
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 2.11 - Disconnecting Means and Control | 2.26.4 | x | NFPA70 - 620.91 - Machine room disconnecting means shall be provided with a compliant mechanical auxiliary contact to disconnect the load from the auxiliary power supply. | ||
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 1.14 - Ventilation | 2.14.2.3 | x | 2.14.2.3.3 - Observation elevator, exposed to direct sunlight, shall have a cab fan with 1 hour rated emergency power source. |