Inspection
Inspection Details
Equipment ID
21062
21062
Inspection Date
2/12/2020
2/12/2020
Inspection Type
Annual Inspection
Annual Inspection
Inspector Name
Michial Linenfelser
Michial Linenfelser
Mechanic Name
Richard King
Richard King
Relief Valve Pressure
540
540
Slide
Governor Rope Pull
Door Closing Force
25/22
25/22
External ID
e510dc93-3c3c-48b2-8cda-9387eae5b4d6
e510dc93-3c3c-48b2-8cda-9387eae5b4d6
Location
Arlington Grove Byrd & Clara
1538 CLARA AVE, SAINT LOUIS, MO
1538 CLARA AVE, SAINT LOUIS, MO
Owner
Arlington Grove Limited Prt
5547 DR MARTIN LUTHER KING DR, SAINT LOUIS, MO 63112-4263
5547 DR MARTIN LUTHER KING DR, SAINT LOUIS, MO 63112-4263
Billing
Attn: Arlington Grove Limited Prt
5547 DR MARTIN LUTHER KING DR, SAINT LOUIS, MO 63112-4263
5547 DR MARTIN LUTHER KING DR, SAINT LOUIS, MO 63112-4263
Violations
Code | Item | Section | Reinspection | Red Tag | Reason For Violation | Fixed Date |
---|---|---|---|---|---|---|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 5.1 - Pit access, lighting, stop switch, and condition | 8.6.4.7 Cleaning of Pits | Pit needs to be cleaned of debris and oil. | 3/31/2021 | ||
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 1.17 - Standby power operation | 8.11.2.1.1(q) | x | Battery backup lowering unit not working correctly. | 7/25/2023 | |
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 2.41 - Maintenance Records | 8.6.1.4 | Provide MCP. | 1/29/2024 | ||
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 5.1 - Pit access, lighting, stop switch, and condition | 8.6.4.7 Cleaning of Pits | Clean pit (oil). | 1/29/2024 | ||
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 5.11 - Plunger and Cylinder | 3.18 | Packing (left piston) worn and leaking. | 1/29/2024 | ||
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 5.11 - Plunger and Cylinder | 3.18 | Empty drain pans. | 1/29/2024 | ||
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 5.1 - Pit access, lighting, stop switch, and condition | 8.6.4.7 Cleaning of Pits | Remove oil from the sump hole. | 1/29/2024 | ||
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 5.1 - Pit access, lighting, stop switch, and condition | 8.6.4.7 Cleaning of Pits | Determine if sump pump works correctly, if not replace. | 1/29/2024 | ||
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 1.17 - Standby power operation | 3.26.10 (Auxiliary Power)(Re-Inspection) | x | Standby power operation failed cat one testing | 12/6/2023 | |
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 5.1 - Pit access, lighting, stop switch, and condition | 8.6.4.7 Cleaning of Pits | Clean oil from Pit | 1/29/2024 | ||
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 5.11 - Plunger and Cylinder | 3.18 | Replace worn packing on left cylinder | 1/29/2024 | ||
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 5.11 - Plunger and Cylinder | 3.18 | Empty pit drip pans | 1/29/2024 | ||
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 5.1 - Pit access, lighting, stop switch, and condition | 8.6.4.7 Cleaning of Pits | Remove oil from pit sump | 1/29/2024 | ||
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 1.6 - Car emergency signal | 2.27.1 Phone or alarm not functioning (Mandatory Re-Inspection due in 14 days) | x | Emergency communication inoperable. Re-inspection required | 1/2/2024 | |
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 2.5 - Housekeeping | 8.6.4.9 Cleaning of Car Tops | Clean the car top. | |||
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 2.3 - Lighting and receptacles | 2.7.5.1 Lighting | Provide top of car light to work. |