Inspection
Inspection Details
Equipment ID
7931
7931
Inspection Date
1/30/2020
1/30/2020
Inspection Type
Reinspection
Reinspection
Inspector Name
Clyde Johnson
Clyde Johnson
Mechanic Name
Stephen Lupo
Stephen Lupo
Relief Valve Pressure
430
430
Slide
Governor Rope Pull
Door Closing Force
16
16
External ID
fb08edac-d7fc-4635-832c-31417b73811b
fb08edac-d7fc-4635-832c-31417b73811b
Location
Parkway Towers Office Bldg
225 S MERAMEC AVE, CLAYTON, MO
Phone: (314) 880-7676
225 S MERAMEC AVE, CLAYTON, MO
Phone: (314) 880-7676
Owner
Attn: BMO-I Parkway Tower c/o Intelica
BMO-I Parkway Tower c/o Intelica
600 Emerson Rd, Ste 210, Creve Coeur, MO 63141
Phone: (000) 000-0000
BMO-I Parkway Tower c/o Intelica
600 Emerson Rd, Ste 210, Creve Coeur, MO 63141
Phone: (000) 000-0000
Billing
Same as Owner
Violations
Code | Item | Section | Reinspection | Red Tag | Reason For Violation | Fixed Date |
---|---|---|---|---|---|---|
MO Minimum : Elevators | (B) - Car Enclosure: Passenger | (B)12 (Door open zones) | x | Restricted opening inoperative, repair. | 9/30/2019 | |
MO Minimum : Elevators | (S) - Fire Service | (S)1 | x | x | No audible signal on Phase I return. | 1/30/2020 |
MO Minimum : Elevators | (B) - Car Enclosure: Passenger | (B)12 (Door open zones) | x | Repair car door restrictor. | 1/30/2020 | |
MO Minimum : Elevators | (B) - Car Enclosure: Passenger | (B)12 (Door open zones) | x | Door restrictor works intermittently. Repair or replace. | 10/1/2020 | |
MO Minimum : Elevators | (G) - Maintenance, Repair and Replacements | 8.6.5.5.2 Oil Leakage Collection | Provide pit bucket for oil collection. | 9/17/2020 | ||
A17.1-2016 : Elevators | 2.8 - Pipes, wiring, and ducts | 2.8 | x | Provide feeder location on main line disconnect (NEC620.51) | 7/31/2023 | |
A17.1-2016 : Elevators | 2.8 - Pipes, wiring, and ducts | 2.8 | x | Provide feeder location on 110v. disconnect(NEC620.51). | 7/31/2023 | |
A17.1-2016 : Elevators | 5.1 - Pit access, lighting, stop switch, and condition | 2.8 | x | Provide pit GFCI outlet to work properly (NEC620). | 7/31/2023 | |
A17.1-2016 : Elevators | 2.6 - Ventilation | 2.7.9.2 | x | Provide existing climate control in the elevator machine room to work properly. | 7/31/2023 | |
A17.1-2016 : Elevators | 2.4 - Machine space | 2.7.1 | x | Seal all machine room wall and ceiling penetrations. | 7/31/2023 | |
MO Minimum : Elevators | (H) - Machine Rooms | (H)2 | x | Existing pipes over the elevator equipment are leaking repair as needed. | 7/31/2023 | |
MO Minimum : Elevators | (H) - Machine Rooms | (H)2 | x | Existing pipes to be covered to prevent future leaks/condensation from the elevator equipment. | 7/31/2023 | |
A17.1-2016 : Elevators | 6.4 - Firefighters' service (A17.1b-1989 and later editions) | 2.27.3.2 Phase I Operation Recall by Initiating Device | x | x | Provide Phase I emergency recall operations by Fire Alarm Initiating Devices (FAID) | 7/31/2023 |