Inspection
Inspection Details
Equipment ID
13668
13668
Inspection Date
7/27/2020
7/27/2020
Inspection Type
Major Alteration
Major Alteration
Inspector Name
Curtis Belew
Curtis Belew
Mechanic Name
Edward Bauer
Edward Bauer
Relief Valve Pressure
Slide
C: 15.75", CW: 6.5"
C: 15.75", CW: 6.5"
Governor Rope Pull
C: 100/600 CW: 40/620
C: 100/600 CW: 40/620
Door Closing Force
17
17
External ID
bbdf8a73-bcf8-4178-938d-715c5bc967f4
bbdf8a73-bcf8-4178-938d-715c5bc967f4
Location
Kiener West Garage
604 PINE ST, SAINT LOUIS, MO
Phone: (314) 241-4262
604 PINE ST, SAINT LOUIS, MO
Phone: (314) 241-4262
Owner
Inter Park Holdings LLC
100 S 9TH ST, SAINT LOUIS, MO 63102-1124
100 S 9TH ST, SAINT LOUIS, MO 63102-1124
Billing
Attn: Inter Park
100 S 9TH ST, SAINT LOUIS, MO 63102-1124
100 S 9TH ST, SAINT LOUIS, MO 63102-1124
Violations
Code | Item | Section | Reinspection | Red Tag | Reason For Violation | Fixed Date |
---|---|---|---|---|---|---|
conversion | conversion | conversion - reinspect | x | Door close operation shall require constant pressure on phase 2 fire service. | 10/2/2018 | |
conversion | conversion | conversion - reinspect | x | Car shall return to phase 1 when turning phase 2 switch to off. | 10/2/2018 | |
conversion | conversion | n/a | In car position indicator shall work. | 5/5/2020 | ||
MO Minimum : Elevators | (M) - Car Safeties and Speed Governors | (M)1 | x | x | A category 5 inspection is required. | 2/18/2020 |
MO Minimum : Elevators | (S) - Fire Service | (S)1 | x | Phase 1 and Phase 2 key switches shall be keyed the same. | 2/18/2020 | |
MO Minimum : Elevators | (F) - Electrical Switches | (F)3 | x | Car operating panel is damaged and shall be repaired or replaced as needed. | 2/18/2020 | |
MO Minimum : Elevators | CSR 40-5.100 State Operating Certificate | 5.100(2) Display of Operating Certificate | Post the current state operating certificate in the elevator machine room. | 5/5/2020 | ||
MO Minimum : Elevators | (G) - Maintenance, Repair and Replacements | 8.6.1.6 General Maintenance Methods | The fan located in the elevator cab shall be guarded. | 5/5/2020 | ||
MO Minimum : Elevators | (G) - Maintenance, Repair and Replacements | (G)1 - Door Systems 8.6.4.13 (Re-Inspection) | x | Hoistway door closers shall operate properly. | 2/18/2020 | |
MO Minimum : Elevators | (I) - Pits | (I)6 (Pit Lighting) | The pit lighting shall be operational. | 5/5/2020 | ||
MO Minimum : Elevators | (M) - Car Safeties and Speed Governors | (M)1 | x | x | A category 5 full load test is due. Unit will be modernized in March/April. Deputy Chief Gus Guadamuz approved delay in Category 5 test until MOD. | 2/18/2020 |
MO Minimum : Elevators | (S) - Fire Service | (S)1 | x | x | Phase 1 fire service shall be operational. - Unit Red Tagged | 2/18/2020 |
MO Minimum : Elevators | CSR 40-5.100 State Operating Certificate | 5.100(2) Display of Operating Certificate | Post the current state operating certificate in the elevator machine room. | 5/5/2020 | ||
MO Minimum : Elevators | (G) - Maintenance, Repair and Replacements | 8.6.1.6 General Maintenance Methods | The fan located in the elevator cab shall be guarded. | 5/5/2020 | ||
MO Minimum : Elevators | (G) - Maintenance, Repair and Replacements | (G)1 - Door Systems 8.6.4.13 (Re-Inspection) | x | Hoistway door closers shall operate properly. | 7/27/2020 | |
MO Minimum : Elevators | (I) - Pits | (I)6 (Pit Lighting) | The pit lighting shall be operational. | 5/5/2020 | ||
MO Minimum : Elevators | (M) - Car Safeties and Speed Governors | (M)1 | x | x | A category 5 full load test is due. Unit will be modernized in March/April. Deputy Chief Gus Guadamuz approved delay in Category 5 test until MOD. | 7/27/2020 |
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 2.8 - Pipes, wiring, and ducts | 2.8.1 | x | Machine room wiring shall be enclosed. | 9/30/2020 | |
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 2.8 - Pipes, wiring, and ducts | 2.8.1 | x | All wireway and electrical device covers must be installed. | 9/30/2020 | |
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 2.8 - Pipes, wiring, and ducts | 2.8.1 | x | Temporary wiring must be removed. | 9/30/2020 | |
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 2.8 - Pipes, wiring, and ducts | 2.8.1 | x | The receptacles in the machine room shall be of the GFCI type. | 9/30/2020 | |
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 2.5 - Housekeeping | 8.11.2.1.2(e) (Re-Inspection) | x | Equipment in the machine room not being used in conjunction with the function or use of the elevators shall be removed. | 9/30/2020 | |
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 5.2 - Bottom clearance, runby, and minimum refuge space | 2.4.2 | x | 2.4.5 - A data plate complying with 2.16.3.3 permanently and securely attached shall be provided in the pit, in the vicinity of the counterweight buffer, indicating the maximum designed counterweight runby. | 9/30/2020 | |
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 2.10 - Numbering of elevators, machines, and disconnect switches | 2.29.1 | x | The machines, controller, governor, isolation transformers, and disconnects shall have an identification number or letter painted or engraved, or securely attached, corresponding to the elevator they serve, and shall be a minimum of 2" in height. | 9/30/2020 | |
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 3.20 - Governor rope | 2.18.5 | x | The governor rope shall have tags installed. | 9/30/2020 | |
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 3.23 - Suspension rope | 2.20 | x | The suspension ropes shall have tags installed. | 9/30/2020 |