Equipment ID
961
961
Inspection Date
2/19/2021
2/19/2021
Inspection Type
Annual Inspection
Annual Inspection
Inspector Name
Michial Linenfelser
Michial Linenfelser
Mechanic Name
Bradley Tramel
Bradley Tramel
Relief Valve Pressure
Slide
Na
Na
Governor Rope Pull
Na
Na
Door Closing Force
22
22
External ID
265bdca8-eac4-4316-a8c9-62e52744c691
265bdca8-eac4-4316-a8c9-62e52744c691
Location
University Square Apartments
605 LELAND AVE, UNIVERSITY CITY, MO
Phone: (314) 727-6264
605 LELAND AVE, UNIVERSITY CITY, MO
Phone: (314) 727-6264
Owner
Attn: University Square Company, a MO LLC
University Square Company, a MO LLC
6631 DELMAR BLVD, UNIVERSITY CITY, MO 63130
Phone: (314) 727-6264
Email: theloopapartments@gmail.com
University Square Company, a MO LLC
6631 DELMAR BLVD, UNIVERSITY CITY, MO 63130
Phone: (314) 727-6264
Email: theloopapartments@gmail.com
Billing
Same as Owner
Violations
Code | Item | Section | Reinspection | Red Tag | Reason For Violation | Fixed Date |
---|---|---|---|---|---|---|
MO Minimum : Elevators | (I) - Pits | (I)1 | The elevator pit floor is covered in water. The elevator pit shall be kept clean and dry. | 3/8/2019 | ||
MO Minimum : Elevators | (I) - Pits | (I)6 (Pit Lighting) | The elevator pit light did not work on the day of inspection, repair for proper illumination of the pit floor. | 3/8/2019 | ||
MO Minimum : Elevators | (G) - Maintenance, Repair and Replacements | (G)1 - Car Emergency Systems - 8.6.4.15 (bell, phone & Emergency lighting) | x | The emergency car lighting is not operational, likely indicating that the back-up power device (battery) has failed. The fixture shall be repaired to operate. Reinspection required. | 3/9/2020 | |
MO Minimum : Elevators | (G) - Maintenance, Repair and Replacements | (G)1 - Car Emergency Systems - 8.6.4.15 (bell, phone & Emergency lighting) | x | When testing the audible signaling device (alarm bell) with the 110V disconnect in the machine room in the “off” position, the device failed to sound, indicating that the back-up power device as failed. Repair for proper operation. Reinspection required. | 3/9/2020 | |
MO Minimum : Elevators | (I) - Pits | (I)1 | The elevator pit floor is covered in water. The elevator pit shall be kept clean and dry. | 2/25/2020 | ||
MO Minimum : Elevators | (I) - Pits | (I)6 (Pit Lighting) | The elevator pit light did not work on the day of inspection, repair for proper illumination of the pit floor. | 2/25/2020 | ||
MO Minimum : Elevators | (F) - Electrical Switches | (F)2 | x | The final and normal limit switches shall be adjusted to operate for proper run-by of the counterweight and buffer. Reinspection required. | 3/12/2021 | |
MO Minimum : Elevators | (I) - Pits | (I)1 | The elevator pit floor is covered in water. The elevator pit shall be kept clean and dry. | 3/21/2021 | ||
MO Minimum : Elevators | (L) - Wire Ropes-Hoisting, Governor and Tiller | (L)12 (Re- Inspection) | x | Hoist ropes are showing rouge and are undersized, replace ropes within 60 days. Re-inspection required | 4/8/2024 | |
MO Minimum : Elevators | (F) - Electrical Switches | (F)9 | x | Sprinkler heads have been added to the elevator machine room, top of the elevator hoistway, and elevator pit without the required heat detectors to activate the shunt trip disconnect before the application of water. Heat detectors shall be installed within 2’ of each sprinkler head to activate the shunt trip disconnect. | ||
MO Minimum : Elevators | (S) - Fire Service | 8.11.2.2.6 Firefighters’ Emergency Operation (Re-Inspection) | x | A17.1 1996 2.11.3b With the addition of sprinklers at the top of the hoistway, smoke detectors are now required and shall be tied into the elevator controller for proper fireman phase I recall operation. | ||
MO Minimum : Elevators | (S) - Fire Service | 211.7 Firefighters Operations/Signage | There is no signage for Firefighters Operation by the phase I key switches. Obtain the correct signage from the building code addition that this elevator was designed to meet. | |||
MO Minimum : Elevators | (I) - Pits | (I)1 | The elevator pit floor is covered in water. The elevator pit shall be kept clean and dry. | |||
MO Minimum : Elevators | (I) - Pits | (I)6 (Pit Lighting) | The pit light fixture failed to illuminate in the pit. Repair pit light fixtures to provide lighting of not less than five (5) foot candles at the pit floor for maintenance and emergency personnel. | |||
MO Minimum : Elevators | (L) - Wire Ropes-Hoisting, Governor and Tiller | (L)12 (Re- Inspection) | x | The elevator hoisting ropes are showing a high degree of wear/rouge and shall be replaced. Replace ropes within 60 days of inspection. Alteration permit and reinspection required. |