Inspection
Inspection Details
Equipment ID
19989
19989
Inspection Date
6/27/2018
6/27/2018
Inspection Type
5 Year Annual Inspection
5 Year Annual Inspection
Inspector Name
Dennis Parker
Dennis Parker
Mechanic Name
Alex Brinkman
Alex Brinkman
Relief Valve Pressure
Slide
12
12
Governor Rope Pull
40/145
40/145
Door Closing Force
28
28
External ID
84bf5a4c-a730-4309-9356-47aab188eb5f
84bf5a4c-a730-4309-9356-47aab188eb5f
Location
Building 4/Tower
8300 EAGER RD, BRENTWOOD, MO
8300 EAGER RD, BRENTWOOD, MO
Owner
DCM Group
8300 EAGER RD STE 601, BRENTWOOD, MO 63144-1419
8300 EAGER RD STE 601, BRENTWOOD, MO 63144-1419
Billing
Attn: DCM Group
8300 EAGER RD STE 601, BRENTWOOD, MO 63144-1419
8300 EAGER RD STE 601, BRENTWOOD, MO 63144-1419
Violations
Code | Item | Section | Reinspection | Red Tag | Reason For Violation | Fixed Date |
---|---|---|---|---|---|---|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | CSR 40-5.100 State Operating Certificate | 5.100(2) Display of Operating Certificate | A current MO State operating certificate shall be posted in the elevator equipment room, in a noncombustible frame with a clear protective vision plate over it. Note: The posted certificate is expired. | |||
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 6.4 - Firefighters' service (A17.1b-1989 and later editions) | 8.6.11.1 Firefighters Emergency Operation: Monthly Testing | A record of findings for firefighters' service operation, tested monthly as required by 8.6.11.1 with identification of the person(s) that performed the operation, and the date shall be available on-site. Note: A fire testing log has been included in the MCP, but has not entries. | |||
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 1.17 - Standby power operation | 2.27.2 | x | The emergency/standby power shall be tested. Note: Building management in scheduling this for after hours. | 9/22/2023 | |
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 6.4 - Firefighters' service (A17.1b-1989 and later editions) | 8.11.2.2.6 Fire Fighters Operation (Re-Inspection) | x | Fire service operation shall be tested as required. Note: Building management in scheduling this for after hours. | 9/22/2023 | |
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 3.10 - Hoistway construction | 2.1 | The elevator shaft enclosure shall be fully enclosed at the top of the hoistway and separated from the top floor lobby attic using noncombustible solid construction or other means acceptable to the MO AHJ. | |||
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 11 CSR 40-5.090 Inspection and Testing | 8.11 Periodic Inspection and Test. | x | This test is incomplete. The hoistway was run, alarm bell, emergency lights, door torque were tested. All other work needs to be completed. Weights were not present during the inspection. Category 5 testing still needs to be completed. | 9/22/2023 | |
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 1.17 - Standby power operation | 2.27.2 | x | The emergency/standby power shall be tested. Note: Building management in scheduling this for after hours. Reinspection Violation still remains after 9/22/2023 inspection. | 11/3/2023 | |
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 6.4 - Firefighters' service (A17.1b-1989 and later editions) | 8.11.2.2.6 Fire Fighters Operation (Re-Inspection) | x | Fire service operation shall be tested as required. Note: Building management in scheduling this for after hours. Reinspection Violation still remains after 9/22/2023 inspection. | 11/3/2023 | |
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 1.17 - Standby power operation | 2.27.2 | x | The emergency/standby power shall be tested. Note: Emergency power generator did not work on 11/3/2023. | 11/20/2023 | |
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | CSR 40-5.100 State Operating Certificate | 5.100(2) Display of Operating Certificate | A current MO State operating certificate shall be posted in the elevator equipment room, in a noncombustible frame with a clear protective vision plate over it. | |||
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 6.4 - Firefighters' service (A17.1b-1989 and later editions) | 8.6.11.1 Firefighters Emergency Operation: Monthly Testing | A record of findings for firefighters' service operation required by 8.6.11.1 with identification of the person(s) that performed the operation shall be kept on site. A fire testing log has been included in the MCP, but is not being logged monthly. | |||
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 1.17 - Standby power operation | 2.27.2 | x | The emergency/standby power shall be tested. | 6/21/2024 | |
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 6.4 - Firefighters' service (A17.1b-1989 and later editions) | 8.11.2.2.6 Fire Fighters Operation (Re-Inspection) | x | There are two fire recall key-switches in the building fire control station, but only one group of four elevators. The extra non-functioning key-switch shall be removed. | 6/21/2024 | |
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 6.4 - Firefighters' service (A17.1b-1989 and later editions) | 2.27.3.1.5 Phase 1 Visual Signal (Re-Inspection) | x | The building fire control station recall key-switch shall be provided with an illuminated visual signal to indicate when Phase I Emergency Recall Operation is in effect. | 6/21/2024 | |
MO Minimum : Elevators | (G) - Maintenance, Repair and Replacements | 8.6.1.6.7 Signs and Data Plates | The data plate specifying minimum door times shall be filled out. | |||
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 6.4 - Firefighters' service (A17.1b-1989 and later editions) | 8.11.2.2.6 Fire Fighters Operation (Re-Inspection) | x | There are two fire recall key-switches in the building fire control station, but only one group of four elevators. The extra non-functioning key-switch shall be removed. | ||
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 6.4 - Firefighters' service (A17.1b-1989 and later editions) | 2.27.3.1.5 Phase 1 Visual Signal (Re-Inspection) | x | The building fire control station recall key-switch shall be provided with an illuminated visual signal to indicate when Phase I Emergency Recall Operation is in effect. |