Inspection
Inspection Details
Equipment ID
6056
6056
Inspection Date
8/23/2018
8/23/2018
Inspection Type
Alteration
Alteration
Inspector Name
Michial Linenfelser
Michial Linenfelser
Mechanic Name
John Carpentier, Sr.
John Carpentier, Sr.
Relief Valve Pressure
Slide
n/a
n/a
Governor Rope Pull
n/a
n/a
Door Closing Force
n/a
n/a
External ID
bc24ef83-e378-4e7d-a636-5d8cd1509ddd
bc24ef83-e378-4e7d-a636-5d8cd1509ddd
Location
The 900 Walnut Building
900 WALNUT ST, SAINT LOUIS, MO
900 WALNUT ST, SAINT LOUIS, MO
Owner
Netrality Properties
210 N TUCKER BLVD STE 1030, SAINT LOUIS, MO 63101-1941
210 N TUCKER BLVD STE 1030, SAINT LOUIS, MO 63101-1941
Billing
Attn: 900 Walnut Owner LLC
210 N TUCKER BLVD STE 1030, SAINT LOUIS, MO 63101-1941
210 N TUCKER BLVD STE 1030, SAINT LOUIS, MO 63101-1941
Violations
Code | Item | Section | Reinspection | Red Tag | Reason For Violation | Fixed Date |
---|---|---|---|---|---|---|
MO Minimum : Elevators | (G) - Maintenance, Repair and Replacements | (G)1 Maintenance, Repair and Replacements | 1.6 - The elevator ADA telephone inside the elevator is not working properly. Check and repair the phone line of this phone for proper operation and passenger safety. | 5/20/2019 | ||
A17.1-2016 : Elevators | 4.1 - Car platform guard | 2.15.9 | x | Obstruction in pit will not accommodate a 48" platform guard. Customer will need to request a variance. | 5/31/2023 | |
A17.1-2016 : Elevators | 6.4 - Firefighters' service (A17.1b-1989 and later editions) | 2.27.3.1.1 Phase I Emergency Recall Operation | x | x | Test fire service switch at lobby hall station after new one is installed. | 5/31/2023 |
A17.1-2016 : Elevators | 2.1 - Access to machine space | 2.7.3.4 | x | Provide a self-closing and self-locking machine room door. | 5/31/2023 | |
A17.1-2016 : Elevators | 2.1 - Access to machine space | 2.7.3.1 | x | Provide a permanent step at the machine room entrance. | 5/31/2023 | |
A17.1-2016 : Elevators | 1.17 - Standby power operation | 8.6.4.19.7 (Re-Inspection) | x | Test standby power when installation is complete. | 5/31/2023 | |
A17.1-2016 : Elevators | 3.12 - Pipes, wiring, and ducts | 2.8 | x | Install hoistway duct covers. | 5/31/2023 | |
A17.1-2016 : Elevators | 3.12 - Pipes, wiring, and ducts | 2.8 | x | Remove temporary wiring from hoistway. | 5/31/2023 | |
A17.1-2016 : Elevators | 4.2 - Hoistway doors | 2.11 | x | Cover old escutcheon holes in hoistway doors. | 5/31/2023 | |
A17.1-2016 : Elevators | 2.8 - Pipes, wiring, and ducts | 2.8 | x | Install machine room duct covers. | 5/31/2023 | |
A17.1-2016 : Elevators | 2.8 - Pipes, wiring, and ducts | 2.8 | x | Remove all temporary wiring from the machine room. | 5/31/2023 | |
A17.1-2016 : Elevators | 2.14 - Code data plate | 8.9 | x | 8.10.1.1.4 - Provide acceptance test tag permanently attached to controller. | 5/31/2023 |