MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.1.4 Maintenance records
|
|
|
All the on-site documentation required by A17.1 2016 - 8.6.1.2.2 and 8.6.1.4 shall be provided in the machine room. (This item is for notification purposes for future violation in 2022)
|
10/20/2023
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.1.4 Maintenance records
|
|
|
All the on site documentation required by A17.1 2016 8.6.1.2.2 and 8.6.1.4 shall be provided in the machine room. Note: Currently schematics, oil log, and maintenance log are present - please supply the MCP approved by the MO State AHJ.
|
|
MO Minimum : Elevators
|
CSR 40-5.100 State Operating Certificate
|
5.100(2) Display of Operating Certificate
|
|
|
A current MO state operating certificate shall be posted in the elevator equipment shall be posted in the elevator equipment room in a noncombustible frame with a clear protective vision plate over it.
|
|
MO Minimum : Elevators
|
CSR 40-5.100 State Operating Certificate
|
5.100(2) Display of Operating Certificate
|
|
|
A current MO State operating certificate shall be posted in the elevator equipment room, in a noncombustible frame with a clear protective vision plate over it.
|
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
x
|
|
Elevators that are equipped to operate on emergency power shall be tested with no load in the car while operating on the emergency generator.
|
11/18/2024
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.6.5.16.5 Over Speed Valve Testing (Re-Inspect)
|
x
|
|
This unit is equipped with an unsealed overspeed valve and shall be tested with the rated load. This valve may have been installed 9/22 when an alteration (new pumping unit) was installed and inspected by St. Louis County. It is not sealed or tagged, and the adjustment locknut has not been locked down. The on-site MCP was just put in the machine room the day of the inspection, so there is no record of the OSV ever being tested.
|
11/18/2024
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.1.5 Code Data Plate
|
|
|
The code data plate shall be provided in plain view, securely attached to each main line disconnect or controller.
|
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.6.5.16.5 Over Speed Valve Testing (Re-Inspect)
|
x
|
|
This unit is equipped with an unsealed overspeed valve and shall be tested with the rated load. This valve may have been installed 9/2022 when an alteration (new pumping unit) was installed and inspected by St. Louis County. It is not sealed or tagged, and the adjustment locknut has not been locked down. The on-site MCP was just put in the machine room the day of the inspection, so there is no record of the OSV ever being tested. Note: To date this testing has not been performed and customer has not approved elevator company to perform this testing. Failure to perform category 5 test of the overspeed valve within 90 days will result in the unit being locked out of service.
|
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
x
|
|
Elevators that are equipped to operate on emergency power shall be tested with no load in the car while operating on the emergency generator.
|
|