MO Minimum : Elevators
|
CSR 40-5.100 State Operating Certificate
|
5.100(2) Display of Operating Certificate
|
|
|
A current MO State operating certificate shall be posted in the elevator equipment room, in a noncombustible frame with a clear protective vision plate over it.
|
|
MO Minimum : Elevators
|
(H) - Machine Rooms
|
(H)1
|
|
|
Path to machine room shall be kept clear.
|
|
MO Minimum : Elevators
|
CSR 40-5.100 State Operating Certificate
|
5.100(2) Display of Operating Certificate
|
|
|
A current MO State operating certificate shall be posted in the elevator machine room in a noncombustible frame with a clear protective vision plate over it.
|
|
MO Minimum : Elevators
|
(S) - Fire Service
|
8.11.2.2.6 Firefighters’ Emergency Operation (Re-Inspection)
|
x
|
|
Install a fire alarm initiating device to active Phase 1 fire service at each floor served by the elevator and in the associated elevator machine room. Elevator not Red Tagged. Spoke to the State of Missouri and there are no notes or variances filed with the state. Attempted to contact STL County Supervisor but unable to get a return call. Devices shall be installed and tested for compliance or a variance applied for.
|
9/18/2024
|
MO Minimum : Elevators
|
(S) - Fire Service
|
(S)1
|
x
|
x
|
Install a smoke initiating device to active Phase 1 fire service at each floor served by the elevator and in the associated elevator machine room. (Elevator not Red Tagged. Spoke to the State of Missouri and there are no notes or variances filed with the state. Attempted to contact STL County Supervisor but unable to get a return call)
|
9/14/2022
|
MO Minimum : Elevators
|
(S) - Fire Service
|
(S)1
|
x
|
x
|
Install a fire alarm initiating device to active Phase 1 fire service at each floor served by the elevator and in the associated elevator machine room. The installation of the smoke detectors is in progress but has not been completed yet. (Elevator not Red Tagged)
|
9/14/2023
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(1) Minimum Standard
|
x
|
|
The auxiliary power lowering operation shall be functional.
|
3/15/2024
|