MO Minimum : Elevators
|
CSR 40-5.100 State Operating Certificate
|
5.100(2) Display of Operating Certificate
|
|
|
A copy of the current operating certificate shall be displayed in the machine room
|
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
(G)1 - 8.6.4.15 Car Emg Sys (Phone or alarm not functioning Mandatory Re-Inspection due in 14 days)
|
x
|
|
Emergency light and alarm bell does not work.
|
12/22/2021
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.1.6 General Maintenance Methods
|
|
|
Replace sheave liner on traction machine due to wear
|
|
MO Minimum : Elevators
|
(L) - Wire Ropes-Hoisting, Governor and Tiller
|
(L)12 (Re- Inspection)
|
x
|
|
Suspension ropes are undersized. 60 days to repair/reinspect.
|
12/22/2021
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
x
|
|
Test car buffer at rated speed, rated load
|
1/4/2022
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
x
|
|
Test car safety with rated load, rated speed
|
1/4/2022
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
x
|
|
Test counterweight buffer at rated speed
|
1/4/2022
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
x
|
|
Test elevator for operation on emergency power. Re-inspection required
|
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
x
|
|
Test machine brakes with 125% of rated load
|
1/4/2022
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
x
|
|
Test phase 1 & 2 fire service
|
1/4/2022
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
(G)1- 8.6.4.15 Car Emergency Systems (Emergency Light) (Re-Inspection)
|
x
|
|
The emergency car lighting is not operational.The fixture shall be repaired to operate. Reinspection required.
|
12/6/2023
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
x
|
|
The testing has not been completed on the elevator at this time. Emergency power operation shall be performed before the inspection is completed.
|
12/6/2023
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.1.6 General Maintenance Methods
|
|
|
Traveling cable support (kellum) is broken at 22nd floor, needs to be replaced
|
|