Code Item Section Reinspection Red Tag Reason For Violation Fixed Date
A17.1-1996 : Elevators CSR 40-5.100 State Operating Certificate 5.100(2) Display of Operating Certificate A current MO State operating certificate shall be posted in the elevator equipment room, in a noncombustible frame with a clear protective vision plate over it.
A17.1-1996 : Elevators 1.17 - Standby power operation 211.2 x The auxiliary power lowering operation shall be functional.
A17.1-1996 : Elevators 2.11 - Disconnecting Means and Control 210.4 x Where an additional power source is connected to the load side of the disconnecting means, the disconnecting means required in Section 620-51 shall be provided with an auxiliary contact that is positively opened mechanically and the opening shall not be solely dependent on springs. This contact shall cause the additional power source to be disconnected from its load when the disconnecting means is in the open position.