Code Item Section Reinspection Red Tag Reason For Violation Fixed Date
MO Minimum : Elevators (A) - Hoistways (A)13 A temporary construction barrier was installed in the elevator hoistway between the elevator cars. This barrier is designed for only temporary use and shall be removed from the hoistway. 8/7/2023
conversion conversion n/a Plug holes in top of main disconnects 8/21/2018
conversion conversion n/a Remove trash and storage from machine room 8/21/2018
conversion conversion n/a Bring car up to contract speed 8/21/2018