conversion
|
conversion
|
n/a
|
|
|
replace hoist cables - 3 months to accomplish
|
7/24/2018
|
conversion
|
conversion
|
n/a
|
|
|
CPR handriail missing - 3 months to accomplish
|
7/24/2018
|
MO Minimum : Elevators
|
(I) - Pits
|
(I)6 (Pit Lighting)
|
|
|
Pit light not working.
|
11/26/2019
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
(G)1 Maintenance, Repair and Replacements
|
|
|
Replace machine tie down isolation pads that are deteriorated.
|
3/17/2021
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
x
|
|
Test incomplete, need to test fire service to complete testing. Re-inspection required
|
8/26/2024
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
x
|
|
Elevator ceased operation during testing. Machine room emergency light, alarm, phone and door closing force were the only tests performed. Need to perform all other tests to complete inspection. Re-inspection required
|
|