Code | Item | Section | Reinspection | Red Tag | Reason For Violation | Fixed Date |
---|---|---|---|---|---|---|
MO Minimum : Elevators | (G) - Maintenance, Repair and Replacements | 8.6.1.4 Maintenance records | Provide MCP in machine room. | 3/17/2022 | ||
A17.1-1996 : Elevators | 2.8 - Pipes, wiring, and ducts | 102.2 | water line or condastate line running over top of controller an hydro tank non elev related | 4/4/2019 |