A17.1-1996 : Elevators
|
5.1 - Pit access, lighting, stop switch, and condition
|
106.1
|
|
|
Pit shall be kept dry. Remove rust from pit equipment, repair/replace as needed, apply rust prevention treatment to all pit steel, investigate/repair water leak. Pit steel starting to delaminate.
|
12/18/2023
|
A17.1-1996 : Elevators
|
2.7 - Fire Extinguisher
|
1206.1h
|
|
|
Machine room shall have proper fire extinguisher and shall have current monthly/annual test tag.
|
12/18/2023
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.3.1 Replacement Parts
|
|
|
Permanently mounted pressure gauge shall be replaced with properly calibrated gauge or pressure fitting.
|
12/18/2023
|
A17.1-1996 : Elevators
|
6.4 - Firefighters' service (A17.1b-1989 and later editions)
|
1206.7
|
|
|
MCP fire service testing must be properly documented monthlty on log sheet.
|
12/18/2023
|
A17.1-1996 : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.6.5.16.5 Over Speed Valve Testing
|
|
|
This elevator is equipped with an over speed valve that in not sealed. A category 5 test shall be performed on the over speed valve in 2021 or 2022. The valve shall be sealed and tagged after the category 5 test.
|
12/27/2022
|
A17.1-1996 : Elevators
|
5.1 - Pit access, lighting, stop switch, and condition
|
106.1
|
|
|
The pit shall be kept clean and dry. Remove water from the pit floor.
|
12/27/2022
|
A17.1-1996 : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.6.5.16.5 Over Speed Valve Testing (Re-Inspection)
|
x
|
|
This elevator is equipped with an unsealed overspeed valve and shall have a category 5 test performed in 2022. The overspeed valve shall be tagged and sealed after a successful test.
|
12/12/2022
|