A17.1-1996 : Elevators
|
1.17 - Standby power operation
|
1001.2(a)(17)
|
x
|
|
The emergency power shall be tested with 125% of capacity.
|
7/28/2019
|
A17.1-1996 : Elevators
|
1.17 - Standby power operation
|
1001.2(a)(17)
|
x
|
|
Emergency/standby power operation of the elevators shall be operational.
|
10/5/2021
|
A17.1-1996 : Elevators
|
CSR 40-5.100 State Operating Certificate
|
5.100(2) Display of Operating Certificate
|
|
|
A current MO State operating certificate shall be posted in the elevator equipment room, in a noncombustible frame with a clear protective vision plate over it.
|
3/21/2024
|
A17.1-1996 : Elevators
|
2.41 - Maintenance Records
|
8.6.1.4
|
|
|
A code compliant MCP and all the on-site documentation required by A17.1 2016 - 8.6.1.2.2 and 8.6.1.4 shall be provided in the machine room. The monthly fire service checklist is missing.
|
3/21/2024
|
A17.1-1996 : Elevators
|
1.18 - Restricted opening of car or hoistway doors
|
111.5 Restricted Opening of Hall/Car Doors
|
x
|
|
Car door restrictor shall work at all floors.
|
6/26/2023
|
A17.1-1996 : Elevators
|
1.17 - Standby power operation
|
211.2
|
x
|
|
Elevators that are equipped to operate on emergency power shall be tested with no load in the car while operating on the emergency generator.
|
6/26/2023
|
A17.1-1996 : Elevators
|
5.1 - Pit access, lighting, stop switch, and condition
|
106.1
|
|
|
Pit shall be kept clean. Remove excess debris.
|
3/21/2024
|
A17.1-1996 : Elevators
|
1.17 - Standby power operation
|
211.2
|
x
|
|
Elevators that are equipped to operate on emergency power shall be tested with no load in the car while operating on the emergency generator.
|
7/18/2023
|
A17.1-1996 : Elevators
|
1.6 - Car emergency signal
|
211.1 Phone or alarm not functioning (Mandatory Re-Inspection due in 14 days)
|
x
|
|
Two-way communication device shall work. It dials out, but no answer.
|
3/13/2025
|
A17.1-1996 : Elevators
|
1.6 - Car emergency signal
|
211.1 Phone or alarm not functioning (Mandatory Re-Inspection due in 14 days)
|
x
|
|
Alarm bell shall work with loss of main 120v power. Bell is very weak.
|
3/13/2025
|
conversion
|
conversion
|
n/a
|
|
|
All machine room lighting shall be operational.
|
10/1/2019
|
conversion
|
conversion
|
conversion - reinspect
|
x
|
|
Replace the hoist ropes.
|
4/23/2019
|
conversion
|
conversion
|
conversion - reinspect
|
x
|
|
Schedule a full lad test of the emergency power system on elevators 1-8.
|
4/23/2019
|
MO Minimum : Elevators
|
(S) - Fire Service
|
8.11.2.2.6 Firefighters’ Emergency Operation (Re-Inspection)
|
x
|
|
When testing fire service, the fire service key switch would not go onto "hold". Repair or replace the switch as needed.
|
4/7/2022
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.1.6.7 Signs and Data Plates
|
|
|
Phase 2 switch Halo to be replaced. It is currently unreadable.
|
3/21/2024
|
MO Minimum : Elevators
|
(S) - Fire Service
|
8.11.2.2.6 Firefighters’ Emergency Operation (Re-Inspection)
|
x
|
|
When testing fire service, the fire service key switch would not go onto "hold". Repair or replace the switch as needed.
|
5/12/2022
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
x
|
|
Testing incomplete: Began annual & Cat 5 testing, remaining testing to be finished by another inspector. Items tested - Hoistway, door, gate, restrictor, cartop, pits, light, bell, phone, comp-sheave, ring & string, terminal limits.
|
3/13/2025
|