conversion
|
conversion
|
n/a
|
|
|
Replace defective hoist cables due to diameter reduction and breakage. 30-day replacement.
|
8/2/2019
|
MO Minimum : Elevators
|
CSR 40-5.100 State Operating Certificate
|
5.100(2) Display of Operating Certificate
|
|
|
Place current state operating certificate in elevator machine room
|
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
x
|
|
Perform emergency power generator test to complete testing
|
9/21/2024
|
MO Minimum : Elevators
|
(L) - Wire Ropes-Hoisting, Governor and Tiller
|
(L)12 (Re- Inspection)
|
x
|
|
Replace suspension ropes that are below minimum diameter.
|
6/28/2022
|