ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
3.23 - Suspension rope
|
8.11.2.1.3(cc)(3) Replace when diameter is reduced (Re-Inspection)
|
Yes
|
No
|
The hoist ropes have reached the minimum acceptable diameter and shall be replaced and re-inspected within 90 days.
|
9/22/2020
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
1.17 - Standby power operation
|
8.11.2.1.1(q)
|
Yes
|
No
|
Elevators that are equipped to operate on emergency power shall be tested with no load in the car while operating on the emergency generator.
|
8/4/2021
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
1.17 - Standby power operation
|
8.11.2.1.1(q)
|
Yes
|
No
|
Tested elevator on simulated emergency power. There are some problems in the transfer switch. Proper emergency power operation shall be tested once corrections are made.
|
5/4/2022
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
5.2 - Bottom clearance, runby, and minimum refuge space
|
8.11.2.1.5(b)
|
Yes
|
No
|
The counterweight runby is too short. Provide code compliant counterweight runby.
|
5/8/2023
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
1.17 - Standby power operation
|
2.27.2
|
Yes
|
No
|
Elevators that are equipped to operate on emergency power shall be tested with no load in the car while operating on the emergency generator.
|
6/12/2025
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
1.17 - Standby power operation
|
2.27.2.3 (Elevator Emergency Power Illuminated Signal)
|
Yes
|
No
|
Emergency power shall be tested, unit failed to demonstrate power swap, EP Jewel did not illuminate, and unit did not run. Reinspection required with Generator and Transfer Switch. Demonstrate Auto selection switch operation.
|
|