A17.1-2016 : Elevators
|
6.5 -Acceptance Checklist for Firefighters' Service (ASME A17.1-2000 and CSA B44-00): Automatic Elevators
|
2.27.3
|
x
|
x
|
The sprinklers in the pit need to be within 2 ft of the pit floor. NFPA 13 8.15.5.1
|
|
A17.1-2016 : Elevators
|
2.6 - Ventilation
|
8.11.2.1.2(i)
|
x
|
|
Complete the installation of the ventilation fan.
|
|
MO Minimum : Elevators
|
(S) - Fire Service
|
8.11.2.2.6 Firefighters’ Emergency Operation (Re-Inspection)
|
x
|
|
Provide testing of Phase I & II.
|
11/29/2023
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.1.2.1 General Maintenance Requirements Documentation
|
|
|
Provide on-site maintenance control program.
|
10/15/2021
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.1.4 Maintenance records
|
|
|
Provide updated documents
|
3/14/2024
|