Code Item Section Reinspection Red Tag Reason For Violation Fixed Date
MO Minimum : Elevators (G) - Maintenance, Repair and Replacements 8.6.1.2.1 General Maintenance Requirements Documentation A written Maintenance Control Program (MCP) shall be in place to maintain the equipment in compliance with the requirements of 8.6.The MCP shall include but not limited to examinations, tests, cleaning, lubrication, and adjustments to applicable components at regular intervals. 9/19/2025
MO Minimum : Elevators 11 CSR 40-5.090 Inspection and Testing 8.6.5.16.5 Over Speed Valve Testing (Re-Inspect) x OSV is not sealed and required to have a Cat 5 full load test performed. Re-inspection required 9/19/2025
MO Minimum : Elevators 11 CSR 40-5.090 Inspection and Testing 8.6.5.16.5 Over Speed Valve Testing (Re-Inspect) x This elevator has an overspeed valve device installed that is not sealed and is now required to have a 5 year full load test performed. This requirement is due to the State of Missouri adopting the A17.1 2016 version of the elevator safety code. 11/30/2023
A17.1-1996 : Elevators CSR 40-5.100 State Operating Certificate 5.100(2) Display of Operating Certificate Post current State Elevator Certificate.
A17.1-1996 : Elevators 1.6 - Car emergency signal 211.1 Phone or alarm not functioning (Mandatory Re-Inspection due in 14 days) x Phone was not working properly at the time of inspection.