MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
x
|
|
The annual inspection portion of the test has been completed. The category 5 test shall be completed. (Completed next day by another inspector)
|
10/11/2022
|
MO Minimum : Elevators
|
(I) - Pits
|
(I)6 (Pit Lighting)
|
|
|
The pit light shall be operational.
|
12/5/2023
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.1.2.2(d) On-Site Documentation (Written Procedures for Evacuation and Cleaning)
|
|
|
A code compliant MCP and all the on-site documentation required by A17.1 2016 - 8.6.1.2.2 and 8.6.1.4 shall be provided in the machine room. Evacuation procedures are missing. (This item is for notification purposes for future violation in 2022)
|
11/11/2021
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.1.6.7 Signs and Data Plates
|
|
|
The fire service phase one key-switch bezel shall be legible.
|
11/12/2024
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.1.6.7 Signs and Data Plates
|
|
|
The fire service phase two key-switch bezel shall be legible.
|
11/12/2024
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.1.6.7 Signs and Data Plates
|
|
|
The fire service phase one key-switch bezel shall be legible.
|
12/5/2023
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.1.6.7 Signs and Data Plates
|
|
|
The fire service phase two key-switch bezel shall be legible.
|
12/5/2023
|