A17.1-1996 : Elevators
|
1.17 - Standby power operation
|
1001.2(a)(17)
|
x
|
|
Battery lowering device does not work per code. Where auxiliary power lowering operation is installed or altered, it shall conform to 3.26.10.
|
9/2/2022
|
A17.1-1996 : Elevators
|
1.6 - Car emergency signal
|
1001.2(a)(6) (Phone or alarm not functioning (Mandatory Re-Inspection due in 14 days)
|
x
|
|
Emergency alarm bell shall work.
|
6/18/2019
|
A17.1-1996 : Elevators
|
1.5 - Car lighting and receptacles
|
204.7
|
|
|
Emergency light shall work.
|
8/7/2019
|
A17.1-1996 : Elevators
|
1.6 - Car emergency signal
|
306.11 (Hydro) Phone or alarm not functioning (Mandatory Re-Inspection due in 14 days)
|
x
|
|
Two-way communication device shall give proper location. No location message was given and agent was unable to provide unit location.
|
3/17/2023
|
A17.1-1996 : Elevators
|
2.41 - Maintenance Records
|
8.6.1.4
|
|
|
Required documentation and MCP shall be provided in the equipment room including wiring diagrams, oil log, and fire service log filled out monthly. The log is not being filled out.
|
3/17/2023
|
A17.1-1996 : Elevators
|
2.41 - Maintenance Records
|
8.6.1.4
|
|
|
A code compliant MCP and all the on-site documentation required by A17.1 2016 - 8.6.1.2.2 and 8.6.1.4 shall be provided in the machine room. Evacuation procedures, monthly fire service testing log, and on-site maintenance records are missing.
|
3/16/2023
|
A17.1-1996 : Elevators
|
2.41 - Maintenance Records
|
8.6.1.4
|
|
|
Provide a code compliant MCP including onsite documents.
|
3/16/2023
|
A17.1-1996 : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.6.5.16.5 Over Speed Valve Testing
|
|
|
This elevator is equipped with an over speed valve that in not sealed. A category 5 test shall be performed on the over speed valve on or before the next annual inspection. The valve shall be sealed and tagged after the category 5 test.
|
3/16/2023
|
A17.1-1996 : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.6.5.16.5 Over Speed Valve Testing (Re-Inspection)
|
x
|
|
This elevator is equipped with an over speed valve that in not sealed. A category 5 test shall be performed on the over speed valve. The valve shall be sealed and tagged after the category 5 test.
|
9/2/2022
|