|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
CSR 40-5.100 State Operating Certificate
|
5.100(2) Display of Operating Certificate
|
No
|
No
|
A current MO State operating certificate shall be obtained and displayed in the elevator machine room.
|
4/7/2026
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
CSR 40-5.100 State Operating Certificate
|
5.100(2) Display of Operating Certificate
|
No
|
No
|
A current MO State operating certificate shall be posted in the elevator equipment room, in a noncombustible frame with a clear protective vision plate over it.
|
4/7/2026
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
CSR 40-5.100 State Operating Certificate
|
5.100(2) Display of Operating Certificate
|
No
|
No
|
Up to date operating certificate is required in the machine room.
|
4/27/2026
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
CSR 40-5.100 State Operating Certificate
|
5.100(2) Display of Operating Certificate
|
No
|
No
|
Up to date operating certificate is required in the machine room.
|
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
6.4 - Firefighters' service (A17.1b-1989 and later editions)
|
8.11.2.2.6
|
Yes
|
No
|
Phase 2 fire service shall work
|
4/27/2026
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
6.4 - Firefighters' service (A17.1b-1989 and later editions)
|
8.6.11.1 Firefighters Emergency Operation: Monthly Testing
|
No
|
No
|
MCP Fire service testing must be properly documented monthly on log sheet.
|
4/7/2026
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
6.4 - Firefighters' service (A17.1b-1989 and later editions)
|
8.11.2.2.6 Fire Fighters Operation (Re-Inspection)
|
Yes
|
No
|
Fire service phase 1 shall work properly.
|
4/15/2026
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
2.6 - Ventilation
|
2.8.4
|
No
|
No
|
A drip pan shall be provided under the A/C unit. Water shall not accumulate on the machine room floor.
|
4/7/2026
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
2.41 - Maintenance Records
|
8.6.1.4
|
No
|
No
|
A code compliant MCP and all the on-site documentation required by A17.1 2016 - 8.6.1.2.2 and 8.6.1.4 shall be provided in the machine room. (This item is for notification purposes for future violation in 2022)
|
4/7/2026
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
2.41 - Maintenance Records
|
8.6.1.4
|
No
|
No
|
Wiring diagrams not present in the machine room.
|
4/7/2026
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
2.1 - Access to machine space
|
2.7.3.4
|
No
|
No
|
Machine room door shall be self-closing and self-locking. All three machine room locks are broken. Repair or replace.
|
4/7/2026
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.6.5.16.5 Over Speed Valve Testing
|
No
|
No
|
This elevator is equipped with an overspeed valve. A category 5 test shall be performed on the overspeed valve in 2024
|
4/7/2026
|
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
(G)1 Maintenance, Repair and Replacements
|
No
|
No
|
A/C unit over tank needs drip pan to allow ?uids to ?ow away from pump unit and not on ?oor.
|
4/27/2026
|