Code Item Section Reinspection Red Tag Reason For Violation Fixed Date
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 2.1 - Access to machine space 2.7.3.4 Machine room door shall be self-closing and self-locking. All three machine room locks are broken. Repair or replace.
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 2.6 - Ventilation 2.8.4 A drip pan shall be provided under the A/C unit. Water shall not accumulate on the machine room floor.
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators CSR 40-5.100 State Operating Certificate 5.100(2) Display of Operating Certificate A current MO State operating certificate shall be obtained and displayed in the elevator machine room.
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators CSR 40-5.100 State Operating Certificate 5.100(2) Display of Operating Certificate A current MO State operating certificate shall be posted in the elevator equipment room, in a noncombustible frame with a clear protective vision plate over it.
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 6.4 - Firefighters' service (A17.1b-1989 and later editions) 8.11.2.2.6 Fire Fighters Operation (Re-Inspection) x Fire service phase 1 shall work properly.
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 2.41 - Maintenance Records 8.6.1.4 Wiring diagrams not present in the machine room.
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 2.41 - Maintenance Records 8.6.1.4 A code compliant MCP and all the on-site documentation required by A17.1 2016 - 8.6.1.2.2 and 8.6.1.4 shall be provided in the machine room. (This item is for notification purposes for future violation in 2022)
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 6.4 - Firefighters' service (A17.1b-1989 and later editions) 8.6.11.1 Firefighters Emergency Operation: Monthly Testing MCP Fire service testing must be properly documented monthly on log sheet.
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 11 CSR 40-5.090 Inspection and Testing 8.6.5.16.5 Over Speed Valve Testing This elevator is equipped with an overspeed valve. A category 5 test shall be performed on the overspeed valve in 2024