A17.1-1996 : Elevators
|
1.17 - Standby power operation
|
1001.2(a)(17)
|
x
|
|
Repair battery lowering for proper operation.
|
9/3/2019
|
A17.1-1996 : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.6.5.16.5 Over Speed Valve Testing
|
|
|
Overspeed valve is not sealed. Test and seal on or before next annual inspection.
|
5/11/2021
|
A17.1-2016 : Elevators
|
5.15.2 Unsealed Overspeed Valve
|
8.6.5.16.5 (Re-Inspect)
|
x
|
|
OSV is not sealed and must have a cat 5 weight test performed within 90 days or less
|
9/28/2022
|
A17.1-2016 : Elevators
|
2.36 - Hydraulic Cylinders
|
8.6.5.5.1 Examination and Maintenance
|
|
|
Repack jack that is leaking excessively
|
|