A17.1-1996 : Elevators
|
6.4 - Firefighters' service (A17.1b-1989 and later editions)
|
1206.7
|
|
|
MCP Fire service testing must be properly documented monthly on log sheet.
|
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.1.6.7 Signs and Data Plates
|
|
|
COP shall have car number displayed (multiple units onsite).
|
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
(G)1 - 8.6.4.13 - Door systems
|
|
|
Replace missing/damaged hoistway door gibs.
|
|
A17.1-1996 : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.6.5.16.5 Over Speed Valve Testing
|
|
|
This elevator is equipped with an over speed valve that in not sealed. A category 5 test shall be performed on the over speed valve on or before the next annual inspection. The valve shall be sealed and tagged after the category 5 test.
|
6/30/2022
|
A17.1-1996 : Elevators
|
1.6 - Car emergency signal
|
306.11 (Hydro) Phone or alarm not functioning (Mandatory Re-Inspection due in 14 days)
|
x
|
|
Two-way communication device shall work. The phone dials, but no one answers.
|
5/22/2024
|
A17.1-1996 : Elevators
|
1.17 - Standby power operation
|
211.2
|
x
|
|
Battery lowering shall work. Repair or replace.
|
5/22/2024
|
A17.1-1996 : Elevators
|
1.17 - Standby power operation
|
211.2
|
x
|
|
Elevators that are equipped to operate on emergency power shall be tested with no load in the car, operating on emergency power, annually. Note: There is a discrepancy regarding if this unit operates on emergency power. Contact is reaching out to electrician and will be providing an update.
|
5/22/2024
|
A17.1-1996 : Elevators
|
1.17 - Standby power operation
|
211.2
|
x
|
|
Battery lowering shall work. Repair or replace. (2nd Notice)
|
6/28/2024
|