MO Minimum : Elevators
|
(L) - Wire Ropes-Hoisting, Governor and Tiller
|
(L)12 (Re- Inspection)
|
x
|
|
Hoisting ropes failed guage test, need replacing, maximim time allowed on replacement 30 days
|
10/12/2021
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.1.4 Maintenance records
|
|
|
Need a maintenance control plan on sight posted on controller
|
1/13/2022
|
MO Minimum : Elevators
|
CSR 40-5.100 State Operating Certificate
|
5.100(2) Display of Operating Certificate
|
|
|
Post current state certificate in machine room
|
2/9/2022
|
MO Minimum : Elevators
|
(S) - Fire Service
|
8.6.11.1 Monthly Test and Log
|
|
|
Perform monthly fire service test and document on log posted in machine room
|
2/9/2022
|