A17.1-2016: LULA
|
5.2.2 Hydraulic Limited-Use/Limited-Application Elevators
|
5.2.2.14 Emergency Operations and Signaling Devices (Re-Inspection due in 14 days)
|
x
|
|
Must make Car door Stay open on Phase I fire service 2.27.3.1.6(a)
|
1/25/2024
|
A17.1-2016 : Elevators
|
1.6 - Car emergency signal
|
8.6.4.15 Phone or alarm not functioning (Mandatory Re-Inspection due in 14 days)
|
x
|
|
Must Make Emergency Phone Operable. 8.6.4.15
|
12/14/2023
|
A17.1-2016: LULA
|
5.2.1 Electric Limited-Use/Limited-Application Elevators
|
5.2.1.16.2 Capacity and Data Plates
|
x
|
|
Must provide Alteration Code data Tag 8.9.1
|
1/25/2024
|
A17.1-2016: LULA
|
5.2.2 Hydraulic Limited-Use/Limited-Application Elevators
|
5.2.2.14 Emergency Operations and Signaling Devices (Re-Inspection due in 14 days)
|
x
|
|
Must provide Fire Service Phase I instructional Signage. 8.9.1
|
1/25/2024
|
A17.1-2016: LULA
|
5.2.2 Hydraulic Limited-Use/Limited-Application Elevators
|
5.2.2.14 Emergency Operations and Signaling Devices (Re-Inspection due in 14 days)
|
x
|
|
Must provide Fire Servise Phase I Visual Signal. 8.7.3.31.8(a)
|
1/25/2024
|