MO Minimum : Elevators
|
(S) - Fire Service
|
8.6.11.1 Monthly Test and Log
|
|
|
A monthly record of findings for firefighters' service operation required by 8.6.11.1 with identification of the person(s) that performed the operation shall be available on-site.
|
7/14/2021
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.6.5.16.5 Over Speed Valve Testing
|
|
|
This elevator is equipped with an over speed valve that in not sealed. A category 5 test shall be performed on the over speed valve in 2021 or 2022. The valve shall be sealed and tagged after the category 5 test.
|
7/14/2021
|
MO Minimum : Elevators
|
(S) - Fire Service
|
211.7 Firefighters Operations/Signage
|
|
|
Provide Phase 2 fire service signage in car.
|
11/28/2022
|
MO Minimum : Elevators
|
(I) - Pits
|
(I)6 (Pit Lighting)
|
|
|
Pit light shall work.
|
9/1/2023
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.2.1 Repair Parts
|
|
|
Cartop lamp shall work.
|
9/1/2023
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.4.9 Cleaning of Top of Cars
|
|
|
Car top needs to be cleaned.
|
7/3/2024
|
MO Minimum : Elevators
|
(I) - Pits
|
(I)1
|
|
|
The pit shall be kept clean. Clean the pit.
|
7/3/2024
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.2.1 Repair Parts
|
|
|
Car top lighting does not work.
|
7/3/2024
|
conversion
|
conversion
|
conversion - red tag
|
x
|
x
|
Unit failed 15 minute leak down test. Unit Red-Tagged
|
7/2/2018
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(1) Minimum Standard
|
x
|
|
Battery lowering does not work.
|
7/1/2024
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.11.3.2.2 Cylinders Test shall be performed
|
x
|
|
The relief valve test, cylinder and piping test needs to be repeated after repairs are completed. The hydraulic jack seal failed after the relief test.
|
11/4/2022
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
x
|
|
3.26.10 - Auxiliary power lowering operation shall be tested.
|
9/30/2022
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
x
|
|
Fire service operation shall be tested.
|
9/30/2022
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.6.5.16.5 Over Speed Valve Testing (Re-Inspect)
|
x
|
|
The over-speed valve shall be tested with rated load.
|
9/30/2022
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.11.3.2.2 Cylinders Test shall be performed
|
x
|
|
The relief valve test, cylinder and piping test needs to be repeated after repairs are completed. The hydraulic jack seal failed after the relief test. It has been taken out of service by TKE until repairs can be made. After repairs are complete, a re-inspection needs to be scheduled.
|
9/30/2022
|