MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
x
|
|
Elevators that are equipped to operate on emergency power shall be tested with no load in the car while operating on the emergency generator.
|
2/15/2025
|
A17.1-1996 : Elevators
|
6.4 - Firefighters' service (A17.1b-1989 and later editions)
|
1002.2f
|
x
|
|
Phase 2 fire service still has to be tested. The door open button is not working.
|
1/20/2023
|
A17.1-1996 : Elevators
|
6.4 - Firefighters' service (A17.1b-1989 and later editions)
|
1002.2f
|
x
|
|
Phase 2 fire service still has to be tested. The door open button is not working.
|
6/22/2022
|
A17.1-1996 : Elevators
|
2.41 - Maintenance Records
|
8.6.1.4
|
|
|
Provide a code complaint MCP including onsite documents.
|
8/10/2021
|
A17.1-1996 : Elevators
|
1.3 - Operating control devices
|
1001.2(a)(3)
|
|
|
The door open button on the COP shall be repaired or replaced.
|
8/10/2021
|
A17.1-1996 : Elevators
|
1.3 - Operating control devices
|
1001.2(a)(3)
|
|
|
The door open button shall be operational.
|
6/8/2023
|
A17.1-1996 : Elevators
|
1.6 - Car emergency signal
|
1001.2(a)(6) (Phone or alarm not functioning (Mandatory Re-Inspection due in 14 days)
|
x
|
|
The in car emergency telephone shall be operational with 24/7 support.
|
6/3/2020
|
A17.1-1996 : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.6.5.16.5 Over Speed Valve Testing
|
|
|
This elevator is equipped with an over speed valve that in not sealed. A category 5 test shall be performed on the over speed valve on or before the next annual inspection. The valve shall be sealed and tagged after the category 5 test
|
8/10/2021
|
A17.1-1996 : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.6.5.16.5 Over Speed Valve Testing (Re-Inspection)
|
x
|
|
This elevator is equipped with an over speed valve that in not sealed. A category 5 test shall be performed on the over speed valve. The valve shall be sealed and tagged after the category 5 test.
|
6/22/2022
|