Code | Item | Section | Reinspection | Red Tag | Reason For Violation | Fixed Date |
---|---|---|---|---|---|---|
A17.1-1996 : Elevators | 11 CSR 40-5.090 Inspection and Testing | 8.6.5.16.5 Over Speed Valve Testing | OSV is not sealed & needs full load test & tripping speed checked. Re-inspect in 90 days | 10/28/2022 | ||
A17.1-1996 : Elevators | 2.41 - Maintenance Records | 8.6.1.4 | Written maintenance control program shall be kept on site. | 12/4/2020 |