MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.5.5.1 Examination and Maintenance
|
|
|
System low on oil. Car struggles to make a top terminal floor run. Gland packing leaking, replace.
|
10/23/2019
|
MO Minimum : Elevators
|
(O) - Existing Hydraulic Elevators
|
(O)2
|
|
|
Install pit overflow bucket or oil recovery tank.
|
10/23/2019
|
MO Minimum : Elevators
|
(I) - Pits
|
(I)1
|
|
|
Pit shall be kept clean & dry, there is oil in pit
|
12/23/2022
|
MO Minimum : Elevators
|
(F) - Electrical Switches
|
(F)1
|
x
|
|
Repair broken c.o.p. stop switch
|
10/11/2019
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(1) Minimum Standard
|
x
|
|
Perform jack pressure relief test.
|
10/11/2019
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(1) Minimum Standard
|
x
|
|
Perform system leak-down test.
|
10/11/2019
|