MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
(G)1 Maintenance, Repair and Replacements
|
|
|
Top of Hoistway vent not covered/ screened.
|
|
MO Minimum : Elevators
|
(I) - Pits
|
(I)1
|
|
|
Clean pit.
|
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.1.4.1(a) On-Site Maintenance Records (MCP Records)
|
|
|
None
|
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.5.5.2 Oil Leakage Collection
|
|
|
Remove scavenger unit from pit.
|
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.5.5.2 Oil Leakage Collection
|
|
|
Remove scavenger line.
|
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.5.5.2 Oil Leakage Collection
|
|
|
Provide code complaint means to collect oil in the pit.
|
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.5.5.2 Oil Leakage Collection
|
|
|
Scavenger pumps that do not measure amount of oil returned to hydraulic tank cannot be installed. Either install a recordable scavenger pump or limit the amount of oil stored in the elevator pit to 5 gallons.
|
|