A17.1-2016 : Elevators
|
1.17 - Standby power operation
|
8.6.4.19.7 (Re-Inspection)
|
x
|
|
Need to test elevator for operation on emergency power. Re-inspection required
|
|
conversion
|
conversion
|
n/a
|
|
|
Adjust hoist cable tension.
|
2/28/2019
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
x
|
|
Generator testing has not been completed, needs to be performed. Re-inspection required
|
9/21/2024
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
x
|
|
Generator testing has not been completed. Generator testing needs to be performed. Re-inspection required
|
2/18/2025
|