ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
1.17 - Standby power operation
|
3.26.10 (Auxiliary Power)(Re-Inspection)
|
x
|
|
The auxiliary power lowering operation shall be functional.
|
1/6/2023
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
1.17 - Standby power operation
|
2.27.2
|
x
|
|
Elevators that are equipped to operate on emergency power shall be tested with no load in the car while operating on the emergency generator.
|
11/6/2023
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.6.5.16.5 Over Speed Valve Testing
|
|
|
All 3 units at location are due for category 5 testing of the overspeed valve in 2024.
|
11/12/2024
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
2.41 - Maintenance Records
|
8.6.1.4
|
|
|
A code compliant MCP and all the on-site documentation required by A17.1 2016 - 8.6.1.2.2 and 8.6.1.4 shall be provided in the machine room. Evacuation procedures are missing. (This item is for notification purposes for future violation in 2022)
|
12/28/2021
|