MO Minimum : Elevators
|
(H) - Machine Rooms
|
(H)7
|
|
|
Install cover on life jacket controller(must replace current battery with one that fits in controller box).
|
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.6.5.16.5 Over Speed Valve Testing
|
x
|
|
Perform required testing of plunger gripper with rated load at or before next annual inspection.
|
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.1.4 Maintenance records
|
|
|
Supply electrical prints for controller and life jacket. Replace covers on life jacket controller, it has test procedures.
|
10/27/2020
|
MO Minimum : Elevators
|
(I) - Pits
|
(I)1
|
|
|
Clean pit of oil and debris.
|
10/27/2020
|
MO Minimum : Elevators
|
CSR 40-5.100 State Operating Certificate
|
5.100(2) Display of Operating Certificate
|
|
|
Display updated operating certificate in machine room.
|
10/27/2020
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.1.4.1(a) On-Site Maintenance Records (MCP Records)
|
|
|
A copy of the MCP shall be kept in the machine room for each elevator
|
8/8/2022
|
MO Minimum : Elevators
|
(I) - Pits
|
(I)1
|
|
|
Clean debris from pit
|
8/8/2022
|
MO Minimum : Elevators
|
(H) - Machine Rooms
|
(H)8
|
|
|
Install cover on life jacket controller (must replace current battery with one that fits in the controller box)
|
8/8/2022
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.6.5.16.4 Plunger Gripper Testing
|
|
|
Perform required testing of plunger gripper with rated load at or before next annual inspection
|
8/8/2022
|