A17.1-1996 : Elevators
|
2.3 - Lighting and receptacles
|
1001.2(b)(3) Inspection code
|
|
|
Repair 120 volt GFCI receptacle in machine room.
|
7/9/2020
|
A17.1-1996 : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.6.5.16.5 Over Speed Valve Testing
|
|
|
OSV not sealed. Perform OSV test on or before next annual inspection.
|
3/31/2021
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.5.5.2 Oil Leakage Collection
|
|
|
Drain lines from jack are going back into the tank. Has to go to collection container, not larger than 5 gallons, located in the pit.
|
|