A17.1-1996 : Elevators
|
1.17 - Standby power operation
|
1002.2g (Standby Power Operation)
|
x
|
|
Provide testing
|
7/7/2022
|
A17.1-1996 : Elevators
|
1.17 - Standby power operation
|
211.2
|
x
|
|
Emergency Power was not transferred to the elevator during testing
|
7/7/2022
|
A17.1-2016 : Elevators
|
2.40 - Maintenance Records
|
8.6.1.2.1(a)
|
|
|
Provide MCP
|
7/7/2022
|
A17.1-1996 : Elevators
|
4.12 - Standby power selection switch
|
1002.2g
|
|
|
Provide testing
|
7/17/2022
|
MO Minimum : Elevators
|
CSR 40-5.100 State Operating Certificate
|
5.100(2) Display of Operating Certificate
|
|
|
A copy of the current state operating certificate shall be displayed in the machine room
|
7/11/2024
|
A17.1-1996 : Elevators
|
3.23 - Suspension rope
|
212
|
x
|
|
Ropes are rusted and undersized, need to replace all hoist ropes. Re-inspection required
|
7/12/2024
|