Code Item Section Reinspection Red Tag Reason For Violation Fixed Date
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 2.33 - Tanks 8.6.5.1 Repair under tank leak and empty overflowing catch pan. 8/7/2019
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 2.5 - Housekeeping 8.6.4.8 Machine Rooms and Machinery Spaces Remove oil soaked pads from machine room floor. 8/7/2019
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 2.35 - Supply Line and Shutoff Valve 3.19 Muffler seepage after pressure relief test. Tighten external bolts on, or rebuild or replace, supply pipe muffler. 8/7/2019
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 2.32 - Control Valve 8.11.3.1.2 (o) x x Control valve pressure spike. Relief valve setting inconsistent. Repair or replace control valve. 12/6/2021
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 2.35 - Supply Line and Shutoff Valve 3.19 x Muffler failed to withhold relief pressure during test. Repair or replace supply pipe muffler. 12/6/2021