ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
1.17 - Standby power operation
|
3.26.10 (Auxiliary Power)(Re-Inspection)
|
x
|
|
Battery lowering not in operation need shunt monitoring to properly operate.
|
11/13/2024
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
1.17 - Standby power operation
|
3.26.10 (Auxiliary Power)(Re-Inspection)
|
x
|
|
Battery lowering not in operation need shunt monitoring to properly operate.
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
6.4 - Firefighters' service (A17.1b-1989 and later editions)
|
2.27.3.1.6(h) Phase 2 Audible/Visual Signal (Re-Inspection)
|
|
|
Visual Phase I indicator not functioning Re-Inspects in 14 days. 1/26/22
|
12/20/2023
|
conversion
|
conversion
|
n/a
|
|
|
Battery lowering is not working
|
10/4/2018
|